Laserfiche WebLink
MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONST. MANAGEMENT <br />March 5, 2012 <br />Janet Binns <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: New Elk Mine Permit C- 1981 -012 <br />Minor Revision No. 109 <br />One Geotech Hole <br />Dear Ms. Binns. <br />On behalf of New Elk Coal Company, (NECC) enclosed is an application for a minor revision to drill <br />one geotechnical hole. The geotechnical exploration hole will be utilized to determine the foundation <br />requirements for a proposed new Blue seam conveyor transfer building. <br />The 6 inch diameter boring will be drilled to a depth of about 70 feet. No roads are required to access <br />the geotechnical hole. <br />Sincerely, <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Ron Thompson, NECC <br />Mike Trujillo, CDOW <br />Attachments: (3) <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7th STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />,0 <br />o „, ‘4.."`" <br />MR -109 Transmittal letter dated March 5, 2012 <br />MR -109 Revision form dated March 5, 2012 <br />MR -109 Exhibit 28 Bond Estimate dated March 5, 2012 <br />MR -109 Map 11, Sheet 3 dated March 5, 2012 <br />