r <br />Table 2 <br />Lafarge West, Inc. <br />Gypsum Ranch Pit, Case No. 02CW211 <br />Substitute Water Supply Plan Water Balance <br />Notes <br />(1) Table 1 Column (6) <br />(2) Replacement schedule provided in Table 1 of Case No. 02CW211 Ruling of the Referee and Decree of the Court <br />(3) Release schedule for CRWCD Contract No. CW03001 <br />(4) Release schedule for CRWCD Contract No. CW03004 <br />(5) [Column (3) + Column (4)] * 10% <br />(6) Column (2) + Column (3) + Column (4) - Column (1) - Column (5) <br />N `°9107 Lafarge West Slope SWSPa\Dr o ple. (Teohmool) \WRPM/Water Rrghts/SWSPo \Gypsum SWSP 12011 SWSP Renewal\Gypsuu 2011 SWSP e10 <br />5/9/2011 <br />Applegate <br />Group, ,.. <br />(1) <br />(2) <br />(3) <br />(4) <br />(5) <br />(6) <br />Month <br />Total Depletions <br />During SWSP Period <br />(additional & decree CU) <br />(ac -ft) <br />Dry up Credit for 15 <br />Acres of CM <br />Stremme & Gates <br />n; *r>, <br />(ac -ft) <br />CRWCD <br />Contract No. CW03001 <br />Release Schedule <br />(ac -ft) <br />CRWCD <br />Contract No. CW03004 <br />Release Schedule <br />(ac -ft) <br />Release Transit <br />Losses -10% <br />(ac -ft) <br />Water Balance <br />(ac -ft) <br />Jul -11 <br />7.39 <br />6.90 <br />0.8 <br />0.00 <br />0.08 <br />0.23 <br />Aug -11 <br />7.23 <br />4.95 <br />2.8 <br />0.00 <br />0.28 <br />0.24 <br />Sep -11 <br />6.55 <br />4.05 <br />3.0 <br />0.00 <br />0.30 <br />0.20 <br />Oct -11 <br />6.07 <br />1.05 <br />5.8 <br />0.00 <br />0.58 <br />0.20 <br />Nov -11 <br />4.37 <br />0.00 <br />5.1 <br />0.00 <br />0.51 <br />0.22 <br />Dec -11 <br />0.85 <br />0.00 <br />0.2 <br />0.94 <br />0.11 <br />0.18 <br />Jan -12 <br />0.85 <br />0.00 <br />0.2 <br />0.94 <br />0.11 <br />0.18 <br />Feb -12 <br />0.85 <br />0.00 <br />0.2 <br />0.94 <br />0.11 <br />0.18 <br />Mar -12 <br />3.27 <br />0.00 <br />3.7 <br />0.18 <br />0.39 <br />0.22 <br />Apr -12 <br />6.51 <br />0.00 <br />7.5 <br />0.00 <br />0.75 <br />0.24 <br />May -12 <br />7.02 <br />6.15 <br />1.2 <br />0.00 <br />0.12 <br />0.21 <br />Jun -12 <br />7.44 <br />7.50 <br />0.1 <br />0.00 <br />0.01 <br />0.15 <br />Total <br />58.40 <br />30.60 <br />30.6 <br />3.00 <br />3.36 <br />2.44 <br />r <br />Table 2 <br />Lafarge West, Inc. <br />Gypsum Ranch Pit, Case No. 02CW211 <br />Substitute Water Supply Plan Water Balance <br />Notes <br />(1) Table 1 Column (6) <br />(2) Replacement schedule provided in Table 1 of Case No. 02CW211 Ruling of the Referee and Decree of the Court <br />(3) Release schedule for CRWCD Contract No. CW03001 <br />(4) Release schedule for CRWCD Contract No. CW03004 <br />(5) [Column (3) + Column (4)] * 10% <br />(6) Column (2) + Column (3) + Column (4) - Column (1) - Column (5) <br />N `°9107 Lafarge West Slope SWSPa\Dr o ple. (Teohmool) \WRPM/Water Rrghts/SWSPo \Gypsum SWSP 12011 SWSP Renewal\Gypsuu 2011 SWSP e10 <br />5/9/2011 <br />Applegate <br />Group, ,.. <br />