Laserfiche WebLink
Task description: <br />Site: Pepper Pit <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date: 2/23/2012 <br />User: RCO <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $156.32 <br />Total Fleet Cost/Hour: $15632 <br />MATERIAL QUANTITIES <br />Initial Volume 500 <br />Swell factor: <br />Loose volume: <br />Level grade site <br />Cat D6T LGP <br />200 <br />Straight <br />NA <br />1 per day <br />(CRG) <br />1.000 <br />500 LCY <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />State: Colorado <br />County: Rio Grande <br />$49.25 <br />$68.58 <br />$0.00 <br />$38.49 <br />BULLDOZER WORK <br />Permit Action: New 110 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Unadjusted hourly production: 444.6 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: 0 % <br />Average site altitude: 7,700 feet <br />Material weight: 3,300 lbs/LCY <br />Weight description: Decomposed rock - 75% Rock, 25% Earth <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 1.100 <br />Dozing method: 1.000 <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />Abbreviation: None <br />Page 1 of 2 <br />Permit/Job #: M2011034 <br />Filename: M034 -001 <br />CIRCES Cost Estimating Software <br />