Laserfiche WebLink
may schedule a QA / QC monitoring inspection. Construction must be completed <br />prior to other activities on site and no later than May 30, 2012. <br />b) The use of sandstone as a rip -rap material is approved provided it passes the "ring" <br />test as outlined in the review. Material sizing specifications are outlined in the <br />engineering review. The operator and Division will test samples and monitor the <br />rock and structures for stability. If the stone used shows unusual signs of <br />weathering or deterioration the operator shall submit a Technical Revision to <br />address the issue. <br />The Division will review and update the current reclamation liability within 30 days to ensure the <br />bond held covers all aspects of the mine permit now approved. <br />If you need additional information please contact me at the Division of Reclamation, Mining and <br />Safety, Grand Junction Field Office, 101 S. 3rd St., Suite 301, Grand Junction, Colorado 81501, or <br />by telephone no. 970.241.1117. <br />Sincerely, <br />G. Russell Means <br />Environmental Protection Specialist II <br />Cc: Rob Ernst, BLM Uncompahgre Field Office, Montrose <br />