Laserfiche WebLink
-2- <br />Application Review Procedures <br />The Division must act upon your application within thirty (30) days of receipt. <br />The Division for request for a permit by virtue of acceptable performance and financial warranties. for the e conditions included under the <br />Your request is automatically approved if it has not been denied by the Division within thirty (30) days of filing. <br />Division decisi the Permit Transfer the Mine d Land Reclamation l Board by submitting written Request for Administrative decision <br />v Appeal to the Board <br />Do to e Md <br />within sixty (60) days of the date of the decision (please refer to C.R.S. 34 -32 -107 (Hard Rock Statutes), and C.R.S. 34-32.5-107 <br />(Construction Material Rules and Regulations) and C R.S. 4 -4- 104(9)). <br />Notice of Permit Transfer is acknowledged in the monthly activity report attached to the monthly Board Agenda. <br />Once the Permit Transfer document is approved, the originally submitted Performance and Financial Warranties will be returned to <br />the previous operator, as the previous operator is no longer responsible for the reclamation of the transferred operation. <br />NOTICE TO SUCCESSOR OPERATOR: <br />1) co Once m pthe Permliance e Per <br />the Mined <br />Mining Operations or the Colorado Land Reclamation Act for the Extraction of Construction Materials and <br />the Construction Material Rules and Regulations. een <br />ave 2) All of the application materials, as amended and supplemented, are an integral part <br />the p permit. e h v a been <br />iincorporated n <br />ted into the permit by reference. We suggest you keep a copy p <br />of the regulations at the mining operation as a reference. If you are unable to secure a copy of the permit application <br />from the original operator, you may purchase a copy from the Division. <br />3) Changes in the mining and reclamation operations that differ from those described in the permit may require a revision <br />to the permit. We suggest consulting the Mineral Rules and Regulations or the Construction Material Rules and <br />Regulations and/or contacting us to determine if a revision to the permit is necessary. Rule 1.8 and 1.10 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.11 to Conversions. <br />4) On your permit anniversary date each year, you MUST submit an annual fee and report to the Division. Please consult <br />C.R.S. 34 -32- 127(2) for Hard Rock and Metal Mines or C.R.S. 34- 32.5 -125 for all construction materials operations for <br />the applicable annual fee requirements for your operation. <br />