My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-05_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2012-03-05_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:54:40 PM
Creation date
3/6/2012 9:38:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
3/5/2012
Doc Name
OSM Review (Emailed)
From
Amy McGregor
To
DRMS
Type & Sequence
TR62
Email Name
DAB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I he discussion \\ ithin the "1R-62 permit revision application adequately captures the changes <br />made during the soil sampling campaign and site visit in December 201 1 . 1 hest chanues <br />document reasonable scientifically defendable and mutuall\ aureed (OS \I. DR \IS. \RCS. <br />he\ -.fig) de\ iations in the Held sampling procedures approved within TR -61. the soil <br />sampling deviations discussed within TR -62 \\ ere necessar\ based on the on -site conditions <br />present to enable the sampling required within IR -61 to proceed in a timel\ and reasonable <br />manner. it is m■ view that these de\ iations represent scientificall■ acceptable procedures that <br />are in compliance \\ ith the Colorado Regulations at 2.1 4.9 and 2.06.6. <br />To: Rick Williamson. Indian Programs Branch \lanager <br />From: \my \Ic(iregor. Soil Scientist <br />Date: 3'5'2012 <br />Re: C- 1981 -008 1 R -62. Soil Samplinu and Anal■sis Plan Field NIodilications <br />In a letter dated Fehruar■ 14. 2012. Western Fuels submitted a technical permit re\ ision (T R- <br />62) to the Colorado Division of Reclamation and Mining. Safety (DR \IS). This proposed <br />re\ ision addresses field changes made to the sampling and anal\ sis plan previously appro\ ed <br />in permit revision TR -61. The field changes were made during the December 12 through <br />December 16. 2011. soil samplinu campaign that had been required to be conducted in TR -61. <br />the sampling plan was altered Irom I R -61 in the follow ing manner: <br />1) Onl■ two hackhoe pits \\ ere exca\ atcd on Stockpile A <br />2) Onl\ two backhoe pits \\ ere excavated on Stockpile C <br />3) Onl\ lour backhoe pits were exca\ ated on Stockpile 13 <br />4) Soil samples \\ ere taken b\ horizon for the substitute material alread\ graded. <br />J) To accommodate the samplinu probe. soil samples in Stockpile C \\ ere taken in 5 foot <br />inter\ al depths instead of 4 feet inter\ als. <br />6) Due to the small size of the pit. soil samples were obtained b■ a hackhoe instead of the <br />ueoprobe for Stockpile D. <br />7) Due to the small size of the pit. soil samples were obtained by a backhoe instead of the <br />geoprobe for Stockpile E <br />8) Due to the cla■ content and moisture condition of the soil samples. OS \I \\ as unable <br />to collect an adequate spit soil sample. OS \I will collect split samples after the <br />samples ha\ e been dried. uround. and sieved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.