Laserfiche WebLink
MINE NAME: <br />Thomeczek Pit <br />MINE/PROSPECTING ID #: <br />M -1995 -007 <br />MINERAL: <br />Sand and gravel <br />COUNTY: <br />Bent <br />INSPECTION TYPE: <br />Monitoring <br />INSPECTOR(S): <br />Stephanie J. Reigh <br />INSP. DATE: <br />February 22, 2012 <br />INSP. TIME: <br />13:00 <br />OPERATOR: <br />Bent County Ready Mix <br />OPERATOR REPRESENTATIVE: <br />Joe Thomeczek <br />TYPE OF OPERATION: <br />110c - Construction Limited Impact <br />REASON FOR INSPECTION: <br />Normal I &E Program <br />BOND CALCULATION TYPE: <br />Complete Bond <br />BOND AMOUNT: <br />$9,500.00 <br />DATE OF COMPLAINT: <br />NA <br />POST INSP. CONTACTS: <br />None <br />JOINT INSP. AGENCY: <br />None <br />WEATHER: <br />Cloudy <br />INSP 1 " I ■ , TURE: <br />I c■.-■) <br />SIGNATURE DATE: <br />February 27, 2012 <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />MINERALS PROGRAM INSPECTION REPORT <br />PHONE: (303) 866 -3567 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Reclamation Success <br />PROBLEM /POSSIBLE VIOLATION: Problem: Failure to follow approved reclamation plan, or current reclamation <br />plan needs to be updated and clarified pursuant to C.R.S. 34- 32.5 -116 (1). The operator must follow approved <br />reclamation plan or provide sufficient information to describe or identify how the operator intends to conduct <br />reclamation. <br />CORRECTIVE ACTIONS: The operator shall submit a Technical Revision, with the required $216 revision fee, to <br />update and clarify the current approved reclamation plan to reflect existing and proposed activities by the <br />corrective action date. <br />CORRECTIVE ACTION DUE DATE: 3/27/12 <br />INSPECTION TOPIC: Reclamation Success <br />PROBLEM /POSSIBLE VIOLATION: Problem: Tamarisk (salt cedar) trees are present within or have volunteered <br />into the permit area and are becoming established. This is a problem for failure to employ weed control <br />methods for a state listed noxious weed species within the permitted area, and to reduce the spread of weeds <br />to nearby areas as required by Section 3.1.10 (6) of the rule. <br />CORRECTIVE ACTIONS: The operator shall either implement the existing weed control plan, or develop a weed <br />control and management plan in accordance with Section 3.1.10 (6) of the Rule. This plan should be developed <br />in consultation with the county extension agency, or weed control district office and should include specific <br />control measures to be applied, a schedule for when control measures will be applied and a post- treatment <br />monitoring plan. This weed control plan shall be submitted to the Division as a Technical Revision to the <br />approved plan with the appropriate Technical Revision fee of $216.00 by the corrective action date. <br />Page 1 of 6 <br />