Laserfiche WebLink
Task description: Feedlot unit - backfill west highwall <br />Site: West End Gravel Pit #1 Permit Action: 2012 Review <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />02A <br />2/2/2012 <br />GRM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Cost Breakdown: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost/hour: $355.70 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />1,153 <br />1,257 <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Scraper Work Team <br />Source of estimated volume: <br />Source of estimated swell factor: Cat Handbook <br />2,400 lbs/LCY <br />Clay and gravel Dry <br />81,600 pounds <br />34.00 LCY <br />SCRAPER TEAM WORK <br />State: Colorado <br />County: Montrose <br />Equipment Descri ption <br />Cat 637G <br />NA <br />NA <br />NA <br />NA <br />NA <br />CCY <br />LCY <br />COSTShift basis: 1 per day <br />Support Eauipment <br />Swell factor: 1.090 <br />Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />Permit/Job #: M1994011 <br />Abbreviation: None <br />24.00 <br />34.00 <br />29.00 <br />29.00 <br />Page 1 of 2 <br />Filename: M011 -02a <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$101.01 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$229.74 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$355.70 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$355.70 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Task description: Feedlot unit - backfill west highwall <br />Site: West End Gravel Pit #1 Permit Action: 2012 Review <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />02A <br />2/2/2012 <br />GRM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Cost Breakdown: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost/hour: $355.70 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />1,153 <br />1,257 <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Scraper Work Team <br />Source of estimated volume: <br />Source of estimated swell factor: Cat Handbook <br />2,400 lbs/LCY <br />Clay and gravel Dry <br />81,600 pounds <br />34.00 LCY <br />SCRAPER TEAM WORK <br />State: Colorado <br />County: Montrose <br />Equipment Descri ption <br />Cat 637G <br />NA <br />NA <br />NA <br />NA <br />NA <br />CCY <br />LCY <br />COSTShift basis: 1 per day <br />Support Eauipment <br />Swell factor: 1.090 <br />Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />Permit/Job #: M1994011 <br />Abbreviation: None <br />24.00 <br />34.00 <br />29.00 <br />29.00 <br />Page 1 of 2 <br />Filename: M011 -02a <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />