Laserfiche WebLink
Task description: <br />Site: Woodring Pit <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 <br />Performance bond: 1.05 <br />Job superintendent: 40.00 <br />Profit: 10.00 <br />COST SUMMARY WORK <br />Reclamation Cost Update <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 2/24/2012 County: Mesa <br />User: THM <br />Agency or organization name: DRMS <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />Permit Action: SI-03 Permit/Job #: M1978323 <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O & P= <br />CONTRACT AMOUNT (direct + O & P) = <br />500.00 <br />0.00 <br />5.00 <br />Abbreviation: None <br />Filename: M323 -001 <br />Total = <br />Total = <br />$2,293.03 <br />$1,191.92 <br />$2,372.00 <br />$11,351.66 <br />$17,208.61 <br />$130,725.17 <br />500.00 <br />$0.00 <br />$6,536.26 <br />Task <br />Descri I tion <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />O l a <br />02a <br />03a <br />04a <br />05a <br />06a <br />07a <br />08a <br />09a <br />10a <br />11 a <br />12a <br />13a <br />14a <br />15a <br />Rough grade pit floor <br />DOZER <br />- - - - - - - <br />49.46 <br />$10,199.74 <br />Rip compaction on pit floor <br />RIPPi K <br />14.55 <br />$3,214.00 <br />Push overburden off top of north highwall to pit <br />floor <br />DOZER <br />50.71 <br />$10,457.81 <br />$23,028.70 <br />$412.00 <br />$3,719.92 <br />$6,652.15 <br />$412.00 <br />$4,801.52 <br />$7,035.91 <br />$4,434.48 <br />$2,345.30 <br />$537.45 <br />$1,119.08 <br />$233.99 <br />$27,335.56 <br />$7,576.95 <br />Distribute overburden over pit floor <br />SCRAPERI <br />28.86 <br />Distribute and configure overburden on pit floor <br />GRADER <br />2.79 <br />Push topsoil off highwall to pit floor <br />DOZER <br />18.04 <br />Distribute topsoil over pit floor <br />SCRAPER1 <br />8.34 <br />Distribute and configure topsoil on pit floor <br />GRADER <br />2.79 <br />Reduce highwall to 2H:1V <br />DOZER <br />23.28 <br />Haul topsoil from berm to top of east and west <br />slopes <br />SCRAPER] <br />8.82 <br />Spread overburden down east and west slopes <br />DOZER <br />21.50 <br />Haul topsoil from berm to top of east and west <br />slopes <br />SCRAPER1 <br />2.94 <br />Spread topsoil down east and west slopes <br />DOZER <br />2.61 <br />Spread spread overburden on north slope <br />DOZER <br />5.43 <br />Spread spread topsoil on north slope <br />DOZER <br />1.13 <br />16a <br />Revegetate 20 acres disturbance <br />REVEGE <br />24.00 <br />17a <br />Mobilization <br />MOBILIZE <br />5.50 <br />SUBTOTALS: <br />270.75 <br />$ $113,516.56 <br />Task description: <br />Site: Woodring Pit <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 <br />Performance bond: 1.05 <br />Job superintendent: 40.00 <br />Profit: 10.00 <br />COST SUMMARY WORK <br />Reclamation Cost Update <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 2/24/2012 County: Mesa <br />User: THM <br />Agency or organization name: DRMS <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />Permit Action: SI-03 Permit/Job #: M1978323 <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O & P= <br />CONTRACT AMOUNT (direct + O & P) = <br />500.00 <br />0.00 <br />5.00 <br />Abbreviation: None <br />Filename: M323 -001 <br />Total = <br />Total = <br />$2,293.03 <br />$1,191.92 <br />$2,372.00 <br />$11,351.66 <br />$17,208.61 <br />$130,725.17 <br />500.00 <br />$0.00 <br />$6,536.26 <br />