My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-28_REVISION - M1980244 (107)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-02-28_REVISION - M1980244 (107)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 8:20:15 AM
Creation date
2/28/2012 2:39:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
2/28/2012
Doc Name
MINE LIFE EXTENSION 2 APPLICATION
From
CRIPPLE CREEK & VICTOR GOLD
To
DRMS/TC1
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. On Site Processing: <br />Solution (SO) <br />Heap Leach (HL) <br />Description of Amendment: <br />See the accompanying Project Description for additional information. <br />-5- <br />Chemical (CH) 1 J Thermal (TH) <br />El Vat Leach (VL) <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: Onsite processing also includes a flotation <br />and carbon -in -pulp mill. Sodium cyanide, dilute cyanide solution, hydroxide and hydrochloric acid, potassium amly xanthate, dithophosphate and frother <br />are used in the benefication processes. A more complete discussion of these chemicals and usage in the high grade milli facilities, adsorption, desorption, <br />and recovery facilities, and at the valley leach facilities is contained in the Project Description. <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s): <br />Mine Life Extension 2 will provide additional mining in the Main Cresson Mine, the Wildhorse Extension of the East Cresson Mine, and the North <br />Cresson Mine to include the extension of the Schist Island Mine area and the Globe Hill Mine area. Ore will be processed at new high grade mill facilities <br />and at a new valley leach facility to be constructed in Squaw Gulch (SGVLF). The SGVLF will include an adsorption, desorption, and recovery facility. <br />The East Cresson Overburden Storage Area wil be extended and the Squaw Gulch Overburden Storage Area wil be modified to accommodate the SGVLF. <br />
The URL can be used to link to this page
Your browser does not support the video tag.