Laserfiche WebLink
SPILLWAY RIPRAP DESIGN <br />100- YR /24HR PEAK DESIGN FLOW - 5.01 CFS <br />Height of flow (Broad Crested Weir) - H =(Q /CL) ^ 2/3 <br />For C = 2.84, Q= 5.01 cfs, L= 84 in <br />H = 4.79 in, Spillway Elevation 0 5941.75, Crest 0 5943.0 <br />D50 = 0.126M or 5.Oin <br />PLAN VIEW <br />T -40' <br />RIPRAP DESIGN - FROM PAP -0790 - SIMPUFIED DESIGN GUIDEUNES <br />FOR RIPRAP SUBJECTED TO OVERTOPPING FLOW (BuRec, CSU) <br />D50 Cu ^ 1/4=0.55(gf ^ 0.52/S ^ 3 /4)(sin a /(Gs cos a -lxcos a tan phi -sin a)) ^ 1.11 <br />D50= (0.55(gf ^ 0.52 /S ^ 3 /4)(sin a /(Gc cos a- 1)(cos a tan phi -sin a)) ^ 1.11)/Cu ^ 1/4 <br />FOR SOUTH POND - <br />D50 = median stone size (m) <br />Cu = coefficient of uniformity = 1.95, of = unit discharge (m3 /m /s) = 0.066 <br />S = embankment slope (unitless) = 0.333, a - embankment slope (degrees) = 18.43 <br />Gs = specific gravity of riprap - 2.24, phi = angle of repose of the riprap = 42 <br />DIVERSION DIKE <br />r -20' <br />SOUTH DETENTION <br />10 -YR. W.S.EL. - <br />5941.75 CREST 0 <br />5943.0 <br />2.0' --j �---., <br />CREST - in <br />5943.0 <br />WSEL - <br />5941.757 <br />3 -inch LAYER 1 -1/2 -inch <br />050 RIPRAP <br />Zr) <br />6.00' <br />GEC.'i�n Esc <br />MIRAFI 1120N OR <br />ALTERNATE RIPRAP FILTER - EQUIVALENT <br />6 -inch LAYER OF GRAVEL WITH A MAX DIA OF 2 -inch <br />A D50 OF NO.4, AND A MIN. OF NO. 100. <br />T -20' <br />SECTION 11-IRU SPILLWAY <br />For interstitial flow, Vi (flow velocity) _ (gD50) *2.48s ^ 0.58 *CU -2.22 <br />where s = slope in ft per ft = 0.333 <br />( 32. 16x( 5/ 12)) ^ 0.5x(2.48x(0.333)"0.58)x(1.95 ^ -2.22) = 1.090 fps <br />Average velocity is the interstitial velocity multiplied by the porosity <br />(Np) of the riprap - Vav - Vi x Np. <br />for Np 0.45, Vav = 1.090x0.45 = 0.49 fps. <br />Depth of flow is the flow quantity divided by the average velocity - <br />Y = Q/Vav, Y = (5.01/7ft.)/0.49fps = 1.46 ft. or 17.5 in., using <br />an integer multiple of D50 for thickness gives 4xD50 for 20 inches <br />of 5 in. D50 riprap. <br />To provide a safety factor use a riprap with a D50 <br />of 7.5 in. <br />Vi - (32.16x(7 .5/12)) ^ 0.5x(2.48x(0.333) ^ 0.58) <br />x(1.95 -2.22) = 1.33 <br />Vav - 1.19x0.45 = 0.60 fps. <br />Y = (5.01cfs/7ft) /0.60fps = 1.19 ft or 14.3 in, using <br />an integer multiple of 050 for thickness gives 2xD50 <br />for 15 inches of 7.5 in D50 riprap. <br />fps <br />100- YR /24HR PEAK DESIGN FLOW - 5.01 CFS <br />Channel Data <br />Maximum Minimum <br />Slope 0.1155 ft /ft - 0.025 ft /ft <br />Manning's n 0.0280 <br />Height 24.0 in <br />Width 62.0 in 0.0 in <br />Left slope 0.333 ft /ft (V/H) - 0.052 ft/ft <br />Right slope 0.050 ft /ft (V/H) - 0.333 ft/ft <br />Computed Results: <br />Depth 1.91 in <br />Velocity 4.54 fps <br />Percent full 7.9 X <br />DETENTION POND <br />BASIN AREA <br />PA -S 1.749 <br />10 -YR /24 HR DESIGN VOLUME - <br />CN D10 VOLUME <br />89 1.003 6,369 <br />VOLUME PROVIDED 0 ELEVATION - <br />ELEV AREA CONIC <br />4.8 in <br />2.8 fps <br />19.9 X <br />5943.0 8304.86 15,009.2 <br />5942.0 5973.22 7,902.1 <br />5941.75 5520.33 6,517.7 <br />5941.0 3897.19 3,003.7 <br />5940.0 2191.55 0.0 <br />DETENTION POND 100 -YR /24 HR DESIGN VOLUME - <br />BASIN AREA CN D100 VOLUME <br />PA -S 1.749 89 1.873 11,890 <br />UfE SPLLWAY T ROU 4 <br />DAM WITH STONE OR SUITABLE <br />BLOCK TO PROVIDE VERTICAL <br />CHANNEL WALL <br />LATERAL SPILLWAY SECTION (typ.,) <br />1' -4' <br />RIMROCK EXPLORATION & DEVELOPMENT <br />PRINCE ALBERT MINE - 1100 PERMIT APPLICATION <br />EXHIBIT U-2 - STRUCTURES <br />Surface Water Control and Containment Facilities <br />DATE: 2/14/12 <br />DRAWN BY: JCP <br />JR. <br />SHEET 2 OF 5 <br />JAMES C. PIERCE, JR. <br />P.O. BOX 100 <br />IEJOLA, COLORADO 81424 <br />61701 884 -7468 <br />