Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />01 a <br />02a <br />03a <br />04a <br />05a <br />06a <br />07a <br />08a <br />remove and dispose of structures <br />DEMOLISH <br />M 1■1 v■I <br />32.00 <br />$9,474.20 <br />$1,077.61 <br />$2,308.82 <br />$2,556.39 <br />$1,578.00 <br />$46,510.64 <br />$66,029.94 <br />$5,895.76 <br />reduce highwalls to 3:1 <br />DOZER <br />5.18 <br />push overburden down slopes to 3:1 <br />DOZER <br />11.18 <br />spread overburden on pit floor <br />DOZER <br />12.37 <br />rip compaction on pit floor, roads, structure areas <br />RIPPER <br />7.40 <br />spread topsoil on 62 acres <br />DOZER <br />75.05 <br />revegetate dry upland areas(62 acres) <br />REVEGE <br />40.00 <br />mobilization to site <br />MOBILIZE <br />3.33 <br />SUBTOTALS: <br />186.51 <br />$ $135,431.36 <br />Task description: <br />Site: Colona Gravel Pit <br />2012 Update <br />PROJECT IDENTIFICATION <br />Task #: 000 <br />Date: 2/15/2012 <br />User: GRM <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />COST SUMMARY <br />Permit Action: 2012 Review <br />State: Colorado <br />County: Montrose <br />DRMS <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />2.02 Total = <br />1.05 Total = <br />0.00 Total = <br />10.00 Total = <br />TOTAL 0 & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />CONTINGENCY: 3.00 <br />Permit/Job #: M1994005 <br />Abbreviation: None <br />Filename: M005 -000 <br />$2,735.71 <br />$1,422.03 <br />$0.00 <br />$13,543.14 <br />$17,700.88 <br />$153,132.24 <br />500.00 Total = 500.00 <br />0.00 Total = $0.00 <br />5.00 $7,656.61 <br />Total = $4,062.94 <br />TOTAL INDIRECT COST = $29,920.43 <br />TOTAL BOND AMOUNT (direct + indirect) = $165,351.00 <br />