Laserfiche WebLink
r <br />c <br />C <br />z <br />PLAN VIEW <br />63152000 M153006 r114nnn <br />200 0 200 400 <br />Scale (ft) <br />1"=200' <br />Contour Interval = 2' <br />Map Grid -State Plane Zone 0503 NAD83 <br />Surface contours - August 2010 <br />Mem • <br />Permit Boundary <br />Surface Disturbance Boundary <br />Notes <br />Culvert data shown on table 21, page 2.05 -14 and 14a of Mine <br />Permit Text. <br />Key - Sedimentation Control Structures <br />D15 Ditch (with direction of flow) <br />___ Cl- -- -, 12 ----( Culvert <br />C34 ** Culvert installed as needed <br />Berm <br />Small Area Exemption <br />Existing Well <br />Ditch design data shown in Exhibit 19. <br />Discharge (Location <br />Ditch summary on page 2.05 -11. <br />O Proposed Sparge Point <br />® V. E. S. Po)int <br />REVISIONS <br />REV <br />DESCRIPTION <br />BY <br />DATE <br />REV <br />DESCRIPTION <br />BY <br />DATE <br />REV <br />DESCRIPTION <br />BY <br />DATE <br />1 <br />Permit Boundary <br />DMS <br />11/20/86 <br />16 <br />Added containment areas 1, 2. 3, 4, & 5 <br />RCS <br />08/28/91 <br />39 <br />TR -62 Added Culverts C75 and C76 <br />JES <br />01/04/12 <br />2 <br />Ditch D6 extended <br />SM <br />12/09186 <br />17 <br />Added Small Area Exemption around water tanks <br />DF <br />09/20/91 <br />3 <br />Culvert 21, 22 & 23 added - Berm added - Ditch <br />11 & 19 revised - Road around topsoil pile #1 & <br />contained area revised <br />TJA <br />02/26/87 <br />18 <br />Added Coal Stockpiles & Culverts 43 & 44 <br />DF <br />12/26/91 <br />19 <br />Extended Coal Stockpile to D17 <br />RT DB <br />03/26/92 <br />20 <br />Added Culvert 10 Extension & D17A <br />RCS <br />04/08/92 <br />4 <br />Freeboard added to ditch types, ditch and culvert <br />tables revised <br />SM <br />03/19/87 <br />21 <br />Added Develo ment Coal Waste Pile and Sewage <br />p g <br />Treatment Plant. Changed Permit Boundary <br />RCS <br />02/26/93 <br />5 <br />respectively ely and culvert table revised Culverts & 23 are revised to 28, 29 & 30 <br />DMS <br />03/26/87 <br />22 <br />Changed Surface Disturbance Boundary <br />RCS <br />07/20/93 <br />6 <br />Culvert C14 removed from plan <br />DMS <br />04/13/87 <br />23 <br />Added Raw Coal Stacking Tube and revised RDA <br />road and removed Headwall near Lab Bldg. <br />RCS <br />11/17/93 <br />7 <br />C31 added, Ditch 30 added to table <br />SM <br />04/04/88 <br />24 <br />Added D34AAA, D34BBB, D1713, Shower trailer, <br />TS Pile, C46, C47, C48, C50, Temporary Culverts <br />nd Berm along D34BB and D34BBB Added D17B <br />RCS <br />12/01/93 <br />8 <br />Reroute D8, D20 & D24, add D6A & D25A, add <br />C8(2), C32, C33 with drop inlet & C34, move C10, <br />shorten C7, lengthen D4. <br />SM <br />05/31/88 <br />evised Surface Disturbance Boundary <br />RCS <br />02/10/94 <br />9 <br />Remove C1, add road in Refuse Area, extend D11, <br />revise road to Contained Area, add C35 & C36, <br />extend D24, add Drop Inlet #3, Add C37. <br />SM <br />08/09/88 <br />J28Revised <br />dded Wells, Sparge and VES Points <br />RCS <br />03/08/94 <br />oved C50, AddedD24A and C55 <br />RCS <br />04/06/94 <br />10 <br />Ditches 3 & 4 changed from type A to type B & <br />ditch 15 from type B to type C <br />RCS <br />05/04/89 <br />Inset 1 <br />RCS <br />05/18/94 <br />29 <br />Added S.A.E. <br />RCS <br />07/07/94 <br />11 <br />Added note for culverts 28 and 29, revised Raw <br />and Clean Coal Storage Areas and Drainage <br />(included C14, C22 and D32), included C26 at <br />bridge, revised Topsoil Pile location, expanded <br />disturbed area at Clean Coal Storage Area. <br />RCS <br />09/20/89 <br />30 <br />Relocated D32 <br />RCS <br />03/07/95 <br />31 <br />Ditches <br />Added Ditches 24A, 246, 24C, 24D and 24E <br />RCS <br />04/12/95 <br />32 <br />Added C60 & C61 <br />RCS <br />05/10/95 <br />33 <br />Added Culverts through C65, Added Ditches <br />through D32B <br />DGF <br />10/01/95 <br />12 <br />Added diesel fuel station, coal sample system, raw <br />truck dump, temp. truck dump, disturbed area <br />line, ditch around plant, realignment of ditch 23 & <br />24, elbow on outlet of C12, shorten C20, and ditch <br />around plant. <br />DF <br />01/26/90 <br />34 <br />Added Topsoil Stockpile #3, and revised North <br />Collection Ditch around Refuse Area <br />DF <br />10/06/95 <br />35 <br />Added Culverts C12A and C12B <br />RGT <br />08/17/01 <br />36 <br />TR -49, Mine Dewatering System <br />RGT <br />09/18/06 <br />13 <br />Added D33 and Refuse Area Side and North collection ditch. <br />RCS <br />09/11/90 <br />37 <br />TR -55 Bates Mine Portal <br />LKJ <br />02/03/11 <br />14 <br />Added C35, C39, C40 & C41 to Inset 1 <br />DF <br />04/13/87 <br />38 <br />TR -60 Updated culvert locations to as built field <br />locations, revise soil storage area footprint, <br />expand DWDA move top soil pile <br />JES <br />12/30/11 <br />15 1 <br />Added C42 to D32 under Refuse Conv. I <br />DF <br />11/16/90 <br />NOT FOR CONSTRUCTION," <br />V <br />aD <br />I <br />0 <br />U <br />Cn <br />O <br />O <br />N <br />I <br />M <br />I <br />a <br />a <br />I <br />N <br />0! <br />O <br />T <br />O <br />J <br />3 <br />vi <br />a� <br />0 <br />U <br />0 <br />I <br />rn <br />0 <br />V) <br />3 <br />O <br />~I <br />I <br />rn <br />N <br />N <br />c <br />0 <br />d <br />0 <br />c <br />0 <br />U <br />Q) <br />0 <br />0 <br />U <br />0 <br />i <br />to <br />0 <br />xeciamF4taon, <br />Information presented on this map has been reviewed byine <br />and is accurate to the best of my knowledge and information. E <br />0 <br />ru <br />V) <br />4"" r0 <br />Date D!PII Signature <br />1w 1' L O <br />