r
<br />c
<br />C
<br />z
<br />PLAN VIEW
<br />63152000 M153006 r114nnn
<br />200 0 200 400
<br />Scale (ft)
<br />1"=200'
<br />Contour Interval = 2'
<br />Map Grid -State Plane Zone 0503 NAD83
<br />Surface contours - August 2010
<br />Mem •
<br />Permit Boundary
<br />Surface Disturbance Boundary
<br />Notes
<br />Culvert data shown on table 21, page 2.05 -14 and 14a of Mine
<br />Permit Text.
<br />Key - Sedimentation Control Structures
<br />D15 Ditch (with direction of flow)
<br />___ Cl- -- -, 12 ----( Culvert
<br />C34 ** Culvert installed as needed
<br />Berm
<br />Small Area Exemption
<br />Existing Well
<br />Ditch design data shown in Exhibit 19.
<br />Discharge (Location
<br />Ditch summary on page 2.05 -11.
<br />O Proposed Sparge Point
<br />® V. E. S. Po)int
<br />REVISIONS
<br />REV
<br />DESCRIPTION
<br />BY
<br />DATE
<br />REV
<br />DESCRIPTION
<br />BY
<br />DATE
<br />REV
<br />DESCRIPTION
<br />BY
<br />DATE
<br />1
<br />Permit Boundary
<br />DMS
<br />11/20/86
<br />16
<br />Added containment areas 1, 2. 3, 4, & 5
<br />RCS
<br />08/28/91
<br />39
<br />TR -62 Added Culverts C75 and C76
<br />JES
<br />01/04/12
<br />2
<br />Ditch D6 extended
<br />SM
<br />12/09186
<br />17
<br />Added Small Area Exemption around water tanks
<br />DF
<br />09/20/91
<br />3
<br />Culvert 21, 22 & 23 added - Berm added - Ditch
<br />11 & 19 revised - Road around topsoil pile #1 &
<br />contained area revised
<br />TJA
<br />02/26/87
<br />18
<br />Added Coal Stockpiles & Culverts 43 & 44
<br />DF
<br />12/26/91
<br />19
<br />Extended Coal Stockpile to D17
<br />RT DB
<br />03/26/92
<br />20
<br />Added Culvert 10 Extension & D17A
<br />RCS
<br />04/08/92
<br />4
<br />Freeboard added to ditch types, ditch and culvert
<br />tables revised
<br />SM
<br />03/19/87
<br />21
<br />Added Develo ment Coal Waste Pile and Sewage
<br />p g
<br />Treatment Plant. Changed Permit Boundary
<br />RCS
<br />02/26/93
<br />5
<br />respectively ely and culvert table revised Culverts & 23 are revised to 28, 29 & 30
<br />DMS
<br />03/26/87
<br />22
<br />Changed Surface Disturbance Boundary
<br />RCS
<br />07/20/93
<br />6
<br />Culvert C14 removed from plan
<br />DMS
<br />04/13/87
<br />23
<br />Added Raw Coal Stacking Tube and revised RDA
<br />road and removed Headwall near Lab Bldg.
<br />RCS
<br />11/17/93
<br />7
<br />C31 added, Ditch 30 added to table
<br />SM
<br />04/04/88
<br />24
<br />Added D34AAA, D34BBB, D1713, Shower trailer,
<br />TS Pile, C46, C47, C48, C50, Temporary Culverts
<br />nd Berm along D34BB and D34BBB Added D17B
<br />RCS
<br />12/01/93
<br />8
<br />Reroute D8, D20 & D24, add D6A & D25A, add
<br />C8(2), C32, C33 with drop inlet & C34, move C10,
<br />shorten C7, lengthen D4.
<br />SM
<br />05/31/88
<br />evised Surface Disturbance Boundary
<br />RCS
<br />02/10/94
<br />9
<br />Remove C1, add road in Refuse Area, extend D11,
<br />revise road to Contained Area, add C35 & C36,
<br />extend D24, add Drop Inlet #3, Add C37.
<br />SM
<br />08/09/88
<br />J28Revised
<br />dded Wells, Sparge and VES Points
<br />RCS
<br />03/08/94
<br />oved C50, AddedD24A and C55
<br />RCS
<br />04/06/94
<br />10
<br />Ditches 3 & 4 changed from type A to type B &
<br />ditch 15 from type B to type C
<br />RCS
<br />05/04/89
<br />Inset 1
<br />RCS
<br />05/18/94
<br />29
<br />Added S.A.E.
<br />RCS
<br />07/07/94
<br />11
<br />Added note for culverts 28 and 29, revised Raw
<br />and Clean Coal Storage Areas and Drainage
<br />(included C14, C22 and D32), included C26 at
<br />bridge, revised Topsoil Pile location, expanded
<br />disturbed area at Clean Coal Storage Area.
<br />RCS
<br />09/20/89
<br />30
<br />Relocated D32
<br />RCS
<br />03/07/95
<br />31
<br />Ditches
<br />Added Ditches 24A, 246, 24C, 24D and 24E
<br />RCS
<br />04/12/95
<br />32
<br />Added C60 & C61
<br />RCS
<br />05/10/95
<br />33
<br />Added Culverts through C65, Added Ditches
<br />through D32B
<br />DGF
<br />10/01/95
<br />12
<br />Added diesel fuel station, coal sample system, raw
<br />truck dump, temp. truck dump, disturbed area
<br />line, ditch around plant, realignment of ditch 23 &
<br />24, elbow on outlet of C12, shorten C20, and ditch
<br />around plant.
<br />DF
<br />01/26/90
<br />34
<br />Added Topsoil Stockpile #3, and revised North
<br />Collection Ditch around Refuse Area
<br />DF
<br />10/06/95
<br />35
<br />Added Culverts C12A and C12B
<br />RGT
<br />08/17/01
<br />36
<br />TR -49, Mine Dewatering System
<br />RGT
<br />09/18/06
<br />13
<br />Added D33 and Refuse Area Side and North collection ditch.
<br />RCS
<br />09/11/90
<br />37
<br />TR -55 Bates Mine Portal
<br />LKJ
<br />02/03/11
<br />14
<br />Added C35, C39, C40 & C41 to Inset 1
<br />DF
<br />04/13/87
<br />38
<br />TR -60 Updated culvert locations to as built field
<br />locations, revise soil storage area footprint,
<br />expand DWDA move top soil pile
<br />JES
<br />12/30/11
<br />15 1
<br />Added C42 to D32 under Refuse Conv. I
<br />DF
<br />11/16/90
<br />NOT FOR CONSTRUCTION,"
<br />V
<br />aD
<br />I
<br />0
<br />U
<br />Cn
<br />O
<br />O
<br />N
<br />I
<br />M
<br />I
<br />a
<br />a
<br />I
<br />N
<br />0!
<br />O
<br />T
<br />O
<br />J
<br />3
<br />vi
<br />a�
<br />0
<br />U
<br />0
<br />I
<br />rn
<br />0
<br />V)
<br />3
<br />O
<br />~I
<br />I
<br />rn
<br />N
<br />N
<br />c
<br />0
<br />d
<br />0
<br />c
<br />0
<br />U
<br />Q)
<br />0
<br />0
<br />U
<br />0
<br />i
<br />to
<br />0
<br />xeciamF4taon,
<br />Information presented on this map has been reviewed byine
<br />and is accurate to the best of my knowledge and information. E
<br />0
<br />ru
<br />V)
<br />4"" r0
<br />Date D!PII Signature
<br />1w 1' L O
<br />
|