Laserfiche WebLink
970 - 241 -1516 <br />Gu tG - UC - CJ uJ:CO uim 31)303LO IUO " <br />Permit # - (►1 <br />According to C.R.S. 34- 32.5 -116 or 34-32 -116, each year, on the anniversary date of the permit, an operator shall <br />submit the annual fee, an annual report and map showing the extent of current disturbances to affected land, <br />required monitoring information, reclamation accomplished to date and during the preceding year, any new <br />disturbance that 1s anticipated to occur during the upcoming year, any reclamation that will be performed during <br />the upcoming year, the dates for the beginning of active operatiuns, and the date active operations ceased for the <br />year, if any. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules <br />and the act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. is the site identification sign posted in accordance with Rule 3.1.12(1) <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2) <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? � `��`'C r <br />S. Does the mine operate more or less than 180 days per year? <br />If "LESS ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval ofTRMPORARY CESSATION Status? VES <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) c7, 71 <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. 0 <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Tota! acres in various stages of reclamation, since permitted mining activities began: <br />'1'otaI acres <br />backfilled: <br />Total acres <br />graded: <br />Seed <br />application <br />method: <br />1 <br />Total acres <br />seeded w/ <br />a • • raved mix: <br />Total acres <br />fertilized w/ <br />a vd fertilizer: <br />Fertilizer <br />application <br />method: <br />Total acres <br />w /topsoil <br />re laced: <br />Topsoil <br />replacement <br />in.): <br />de <br />12:03:42 p.m. 02 -23 -2012 4/5 <br />YfU 1210 I' 1!L <br />Annual <br />Mulch <br />application <br />method: <br />Total acres , <-- <br />mulched w/' - <br />approved mulch: <br />Mulch application <br />rate (tons): <br />608 NO <br />NO <br />ORE, LESS <br />Ta l <br />C <br />,c ' <br />oa.4 <br />NO <br />p_ c9 f' -c�i- <br />