Laserfiche WebLink
GO <br />CONSULTING <br />ENGINEERING <br />Limited Liability Company <br />Table of Contents <br />PO 984, Kittredge, CO 80457 <br />303 679 9160 f 303 679 -9180 <br />INTRODUCTION 2 <br />WORK PERFORMED 2 <br />RESULTS AND DISCUSSION 3 <br />General Chemistry 3 <br />Radiochemistry 5 <br />Field Parameters 5 <br />Quality Control 5 <br />CONCLUSIONS 6 <br />GENERAL CONDITIONS 7 <br />Figures <br />Figure 1. Well and Sampling Locations <br />Tables <br />Table 1. Results of Second Half, 2010, Groundwater Monitoring, GCC Rio Grande, <br />Inc., Pueblo Cement Plant, Pueblo, Colorado. Sampling Conducted October <br />13, 2011. <br />Table 2. Results History for Parameters of Concern, Groundwater Monitoring, GCC <br />Rio Grande, Inc., Pueblo Cement Plant, Pueblo, Colorado. <br />Appendix <br />Report # Content <br />D28612 General Chemistry analytical data for wells MW002, MW003, MW004, and <br />DUP -01 <br />D28612X Radiochemistry results for wells MW002, MW003, MW004, and DUP -01 <br />1 <br />