My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-05_PERMIT FILE - C1980005 (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980005
>
2012-01-05_PERMIT FILE - C1980005 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:10 PM
Creation date
2/28/2012 8:01:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
PERMIT FILE
Doc Date
1/5/2012
Doc Name
ENVIRONMENTAL RESOURCES
Section_Exhibit Name
Rule 2.04 Environmental Resources
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTI <br />Page No. 32 <br />Permit No.: <br />.: CO-0000221 <br />i) In the case of corporations, by a principal executive officer of at least the level of vice-president or his or her duly <br />authorized representative, if such representative is responsible for the overall operation of the facility from which the <br />discharge described in the form originates; <br />ii) In the case of a partnership, by a general partner; <br />iii) In the case of a sole proprietorship, by the proprietor; <br />iv) In the case of a municipal, state, or other public facility, by either a principal executive officer, ranking elected <br />official, or other duly authorized employee. <br />b. All reports required by permits, and other information requested by the Division shall be signed by a person as described <br />above or by a duly authorized representative of that person. A person is a duly authorized representative only if <br />i) The authorization is made in writing by a person described above; <br />The authorization specifies either an individual or a position having responsibility for the overall operation of the <br />regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, <br />position of equivalent responsibility, or an individual or position having overall responsibility for environmental <br />matters for the company. (A duly authorized representative may thus be either a named individual or any individual <br />occupying a named position); and, <br />iii) The written authorization is submitted to the Division. <br />if an authorization as described in this section is no longer accurate because a different individual or position has <br />responsibility for the overall operation of the facility, a new authorization satisfying the requirements of this section must <br />be submitted to the Division prior to or together with any reports, information, or applications to be signed by an <br />authorized representative. <br />The permittee, or the duly authorized representative shall make and sign the following certification on all such <br />documents: <br />"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in <br />accordance with a system designed to assure that qualified personnel properly gather and evaluate the information <br />submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible <br />for gathering the information, the information submitted is to the best of my knowledge and belief, true, accurate and <br />complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine <br />and imprisonment for knowing violations." <br />0
The URL can be used to link to this page
Your browser does not support the video tag.