Laserfiche WebLink
SCRAPER TEAM WORK <br />Description <br />Acres <br />I <br />Topsoil Thickness <br />I I <br />Loose Volume <br />Unit Cost <br />Total Cost <br />(ac) <br />(ft) <br />(LCY) <br />I ($ /LCY) I <br />($) <br />Replace topsoil on Final Pit <br />45 <br />1 <br />72,600 <br />$ 1.00 <br />$ 72,600.00 <br />Arroyo Restoration <br />883,710 <br />$ 1.00 <br />$ 883,710.00 <br />Arroyo Topsoil <br />27 <br />1 <br />43,560 <br />$ 1.00 <br />$ 43,560.00 <br />$ 999,870.00 <br />Table L -3 GCC Rio Grande Pueblo Limestone Mine Reclamation Cost Estimate <br />Scraper Team Work <br />GCC Rio Grande, Inc. -- Technical Revision 1 <br />