Laserfiche WebLink
DESCRIPTION <br />ARROYO RESTORATION <br />Scraper fill work <br />ABBREVIATIONS <br />Table L -1 <br />Revegetation -25% Failure Rate <br />LIMESTONE.QUARRY -Final _Pit = � <br />Bulldozer work <br />Revegetation -25% Failure Rate <br />TOTAL ESTIMATE-directcasts <br />GCC Rio Grande Pueblo Limestone Mine Quantity Takeoff and Draft Cost Summary <br />MATERIAL DIMENSIONS (Ft) QUANTITY UNIT $ /UNIT <br />Grading <br />Spread topsoil <br />Fertilize,Seed, Mulch <br />Grading 698 sq ft x 2500 ft <br />Grading /spread topsoil 9800 ft * 200 ft * 1 ft / 27 <br />Fertilize,Seed, Mulch 9800 ft * 200 ft <br />883,710 LCY <br />43,560 LCY <br />27 ACRE <br />ARROYO SUBTOTAL <br />64,630 LCY <br />72,600 LCY <br />45 ACRE <br />LIMESTONE QUARRY SUBTOTAL <br />$ 1.00 <br />$ 1.00 <br />$ 512.72 <br />$ 1.00 <br />$ 1.00 <br />$ 512.72 <br />COST ($) <br />$883,710 <br />$43,560 <br />$17,304 <br />$944,574 <br />$64,630 <br />$72,600 <br />$28,841 <br />$166,070 <br />$1,110,644 <br />LCY <br />Loose Cubic Yard <br />GCC Rio Grande Inc., Technical Revision 1 <br />