Laserfiche WebLink
• Detail 68 - Pipelines and roads to 30 -16 Golden Eagle (XTO Energy) <br />• Detail 69 - Stock tank and windmill not in use <br />• Detail 71 - Pipelines and roads to 31 -2 Golden Eagle (XTO Energy) <br />• Detail 72 - Pipelines and roads to 31 -08 Golden Eagle (XTO Energy) <br />• Detail 73 - Pipelines and roads to 31 -6 Golden Eagle (XTO Energy) <br />• Detail 74 - Pipelines and roads to 31 -10 Apache Canyon (XTO Energy) <br />• Detail 76 - Pipelines and roads to 31 -16 Apache Canyon (XTO Energy) <br />• Detail 78 - Pipelines and roads to 6 -2 Apache Canyon (XTO Energy) <br />• Detail 79 - Pipelines and roads to 31 -14 Apache Canyon (XTO Energy) <br />The post - mining and pre - mining land uses of the permit area are identical and are described in detail <br />in Section 2.04.3. The land use is shown on Map 4 - Pre -mine Land Use, and Map -15 Surface <br />Disturbance and Post - mining Land - Use East Portal and Map 16 Surface Disturbance and <br />Post - mining Land Use - West Portal. <br />The Operator plans to monitor subsidence at the mine. The updated subsidence control, monitoring, <br />and mitigation plan is included as Exhibit 24. <br />PR -04 2.05 -95 Revised 02/09/12 <br />