Laserfiche WebLink
components that would potentially lead to acidic runoff or adversely affect groundwater quality. <br />The mine has a long history of stockpiling coal without encountering spontaneous combustion. <br />Technical revision No. 60 allowed the installation of culverts to create a conveyor corridor from <br />the DWDA to the RDA beltline. MR -101 provides for the installation of the conveyor between <br />the DWDA and the RDA beltline. A belt feeder, 500 foot long beltline and one hundred foot long <br />elevating conveyor will be utilized to convey the development waste to the RDA conveyor. <br />Other coal processing support facilities are required and have been constructed at the site. These <br />facilities include buildings, roads, water system, sediment control system, and preparation plant. <br />Roads and sediment control structures are discussed in the <br />PR -04 2.05 -4a Revised 02/29/11 <br />