My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-27_REVISION - C1981010 (7)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2012-02-27_REVISION - C1981010 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:04 PM
Creation date
2/27/2012 1:09:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
2/27/2012
Doc Name
Adequacy Comments
From
Trapper Mining Inc
To
DRMS
Type & Sequence
SL13
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parcel Designation: A -B -00 <br />Reclamation <br />Activity <br />Bond Release <br />Application # <br />Approval Date <br />M:IRECLMHS <br />Phase I <br />SL -5 <br />6 -11 -04 <br />TRAPPER MINE <br />RECLAIMED PARCEL HISTORY <br />Year(s) of <br />Occurrence <br />Phase II <br />SL -6 <br />9 -6 -05 <br />Acreage: 107.9 <br />Comments <br />Regrade <br />Topsoil Replacement <br />Seedbed Preparation <br />Fertilization <br />Seed Mixture(s) <br />2000 <br />2000 <br />2000 <br />2000 <br />2000/2001 <br />Depth (inches): 17.3 <br />How Measured: load count <br />Topsoil Origin: Stockpile ® Livehaul ❑ <br />(12% from Livehaul; 88% from Stockpile) <br />Dragging ® Disking ❑ Other ❑ (explain) <br />Product Used: 11 -54 -0 <br />Rate: 87 lb /ac on replaced topsoil <br />Fertilized in September <br />Refer to Table(s) 97 -02AB <br />88.6 acres seeded in October 2000 <br />26.2 acres seeded in May 2001 <br />Phase Ill <br />SL -13 <br />Comments: 4,903 linear feet of new drainage reconstruction was accomplished in Oak <br />Drainage. <br />Contains Shrub Clump SC -A -01 <br />2004: 10 Acres sprayed with Roundup and interseeded with T04 -AB00 Interseed Mix. <br />2008: landslide disturbed 3.1 ac. <br />2011: 2.1 acres of drainages were removed from Phase Ill bond release. <br />2012: 1.7 acres of road corridor to Oak Ponds removed from Phase Ill bond release. <br />
The URL can be used to link to this page
Your browser does not support the video tag.