My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-27_REVISION - C1981010 (10)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2012-02-27_REVISION - C1981010 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:04 PM
Creation date
2/27/2012 12:37:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
2/27/2012
Doc Name
Adequacy Comments
From
Trapper Mining Inc
To
DRMS
Type & Sequence
SL12
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2 Documentation of Successful Vegetation Establishment <br />Trapper Mine reclaimed rangelands in Flintlock and East Flintlock (Z) pits, as outlined on Map 1, were <br />sampled during 2010 to determine the success of vegetation establishment. Canopy cover, shrub stem <br />density and plant composition were the parameters sampled. The purpose of the sampling was to <br />evaluate the readiness of reclaimed parcels /blocks for Phase II bond release. <br />1.2.1 Methods <br />Vegetation transects were systematically located on the Trapper Mine rangeland block evaluated for <br />Phase II bond release during 2010, as outlined on Map 2. A grid system utilizing 400 -foot vertical and <br />horizontal spacing was overlaid on 1"=400' topography maps to establish systematic transect locations. <br />Transect starting points were field located using a G.I.S. satellite survey system in combination with large - <br />scale topographic maps. Transects were 50 meters in length and run in a random direction from the <br />starting point. All transects were kept within reclaimed parcel boundaries. If the randomly selected <br />transect direction resulted in the possibility of the transect line crossing a parcel boundary, the transect <br />line was turned 180 degrees to avoid crossing the boundary. <br />Plant canopy cover and plant species composition were estimated by using the point -hit technique (Optical <br />Point Bar). Each 50 -meter line transect was monitored at each site with 10 observations recorded along <br />each line transect at 5 -meter intervals (total 100 contacts /transect). <br />Woody stem density was calculated using belt transects. All woody stems located within one meter of <br />either side of the 50 -meter transect line were counted and tallied by shrub species. <br />Transect data were designed to be summarized by individual transects and by reclaimed land "parcels" <br />and "blocks." Parcels were delineated on the basis of: 1) reclaimed pit area, 2) initial year of seeding and <br />3) range site. Blocks consist of a logical grouping of parcels lumped together for bond release evaluation <br />purposes. Plant cover sample adequacy (i.e. number of transects required) was determined by block for <br />Phase II bond release criteria using equations specified by the Colorado Division of Reclamation, Mining <br />and Safety (CDRMS). <br />1.2.2 Results and Discussion <br />Postmine ground cover and woody stem density data for all reclaimed rangelands sampled are <br />summarized by reclaimed block and compared against Trapper's bond release technical standards (Table <br />1.2 -1). Tables 1.2 -2 and 1.2 -3 summarize reclaimed block ground cover and woody stem density, <br />respectively, by life form and by plant species. A complete list of plant species encountered on reclaimed <br />
The URL can be used to link to this page
Your browser does not support the video tag.