My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-24_REVISION - M1999120 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999120
>
2012-02-24_REVISION - M1999120 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:11:59 PM
Creation date
2/27/2012 9:55:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999120
IBM Index Class Name
REVISION
Doc Date
2/24/2012
Doc Name
Submittal
From
L.G. Everist, Inc. and Environment, Inc.
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Primar future (Post - mining) land use (check one): <br />f_J Cropland(CR) Pastureland(PL) _El <br />fl Rangeland(RL) Forestry(FR) _El fJ Residential(RS) JI Recreation(RC) <br />I:1 4 Developed Water Resources(WR) <br />13. Primary present land use (check o <br />Cropland(CR) <br />Rangeland(RL) <br />EE Residential(RS) <br />Developed Water Resources(WR) <br />15. On Site Processing: <br />16. Description of Amendment or Conversion: <br />Pastureland(PL) <br />Forestry(FR) <br />Recreation(RC) <br />Crushing /Screening <br />- 4 - <br />n <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial /Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Trackhoe and front end loaders remove material for delivery to the processing plant. <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Material is processed into specification aggregates using crushers, and screen plants <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />None <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />This amendment increases the mine area and reserves under permit by 641.64 acres. The <br />mining method does not change but he plant site may be moved south as the existing permit <br />area is mined out. The final reclamation plan and reclamation methods do not change. The <br />primary access remains as currently approved. It also combines 2 permitted mines into one and <br />retains the southern access point. Southern access - 40d05'40.41 "N, 104d49'48.17 "W <br />
The URL can be used to link to this page
Your browser does not support the video tag.