Laserfiche WebLink
COLORADO <br />RECLAMATION <br />MINING <br />SAFETY <br />The Division of Reclamation, Mining and Safety has proposed the decision stated below. Provided there <br />are no objections, the decision will become effective upon the termination of the ten (10) day public <br />comment period, in accordance with Rule 2.08.4(6)(b)(iii). <br />Technical Revision No. 73 Decision: Approve <br />Submittal Date: October 17, 2011 Decision Date: February 17, 2012 <br />Description of Revision: Construct and Operate Methane Fueled Electricity Generator and Relocation of <br />Alluvial Monitoring Well. <br />REVISED INFORMATION <br />APPLICATION PAGES <br />2.05 -23c <br />DELETED ITEMS <br />CHANGE IN <br />ACREAGE <br />Disturbed: 0.00 <br />Affected: 0.00 <br />Permit: 0.00 <br />State: 0.00 <br />Federal: 0.00 <br />Private: 0.00 <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />COAL MINING PERMIT - TECHNICAL REVISION DECISION <br />Elk Creek Mine, Oxbow Mining, LLC <br />Permit No. C- 1981 -022 <br />REVISED <br />TOTAL ACREAGE <br />Disturbed: 207.24 <br />Affected: 6,502.40 <br />Permit: 13,429.08 <br />State: 0.00 <br />Federal: 7,878.08 <br />Private: 5,551.00 <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Au thorized Representative <br />Date: 42..1 f Z b I Z. <br />MAPS/EXHIBITS <br />Map 2.05 -M1 sheet 3 of 6 <br />Map 2.05 -M4 sheet 3 of 4 <br />Exhibit 2.04 -E4 Part 3 <br />Exhibit 2.05 -E7 page 3 <br />PERFORMANCE BOND <br />Prior Liability: <br />Change in Liability: <br />Revised Liability <br />Bond Held <br />$4,812,510.39 <br />$0.00 <br />$4,812,510.39 <br />$4,871,606.00 <br />C -TR -09 <br />