My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-23_HYDROLOGY - C1996084
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1996084
>
2012-02-23_HYDROLOGY - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:48:56 PM
Creation date
2/23/2012 3:20:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
HYDROLOGY
Doc Date
2/23/2012
Doc Name
4th Quarter 2011 Quarterly Sediment Pond Inspection
From
New Elk Coal Company, LLC
To
DRMS
Permit Index Doc Type
Sediment Pond Inspections
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mine: Lorencito <br />NPDES ID. No.: <br />Inspection Period: <br />Inspection Date: <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />Pond #7 <br />Fourth Quarter 2011 <br />12/29/11 <br />General Description or Reference to Site Plan: <br />CDMR Rule 4.05.9(17) <br />This pond is located south of the area of mining scheduled for 2001 -02. The pond <br />is partially incised into bedrock and the embankment keyed into bedrock. <br />Side slopes are less than 2H:1V. The primary discharges south into Jeff Canyon <br />drainage. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: Extensive Some Fev\ None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />Excellent ' Moderale Few Poor <br />Yes <br />Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />4). Is erosion occurring at the discharge outlet? Yes <br />Evaluate the severity: Extensive Moderate Just starting None <br />Page 1 of 2 <br />No <br />Nom_ <br />No <br />5). Is seepage occurring through the dam? Yes No <br />Could this seepage cause potential instability? <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? Yes v No <br />2). Is the inlet free of debris and restrictive material? Yes r/ No <br />3). Is the discharge outlet free of restrictive material? Yes No <br />No `�- <br />
The URL can be used to link to this page
Your browser does not support the video tag.