Laserfiche WebLink
EMERGENCY SPILLWAY <br />1). Does it appear that the emergency spillway has discharged water since the last inspection? <br />Yes No >r <br />2). Is erosion occurring at any section of the emergency spillway? <br />Yes No l/ <br />Describe extent: <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes No <br />OTHER OBSERVATIONS <br />GQ ,� k / P ifc'� y �L, c�c' q <br />t�cJcx,s ccel �� v �/ `a l <br />i 1 a_c_e_e,pf 6t-e4 . air i-liff 1,(A/ ( C 1 -7 , <br />- 1 , e c�r� e-- ct,64 Ci j i t c L-t 3 c pg, (1 d <br />s /X 2v / ( Cee “ a 5 3-00)7 <br />33 33,, <br />a 5 cz_oc t y( f Prt 7 S—C4-16 <br />Explain: <br />14a0 <br />MSHA Qualified Impoundment nspector <br />— `z- <br />Date <br />h Qtie L./cif <br />Page 2 of 2 <br />