Laserfiche WebLink
EMERGENCY SPILLWAY <br />1). Does it appear that the emergency spillway has discharged water since the last inspection? <br />Yes No <br />2). Is erosion occurring at any section of the emergency spillway? <br />Yes <br />Describe extent: <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Explain: <br />OTHER OBSERVATIONS <br />M HA Qualified Impoundment Insp . tor <br />_ 5 O f <br />Date <br />S�- <br />c� r{'jpd. <br />Page 2 of 2 <br />No �f <br />No <br />7 <br />� (� t c ✓ � s .� 20/ ( A1111-14a re <br />s- t,v, ck__s e-zic,,,Pc, ze_747 <br />