Laserfiche WebLink
cOt <br />CONSULTING <br />ENGINEERING <br />Limited LIMA My Company <br />INTRODUCTION 1 <br />WORK PERFORMED 1 <br />Dissolved Metals 2 <br />General Chemistry 3 <br />Radiochemistry 3 <br />Field Parameters 4 <br />Colorado Division of Reclamation Mining an Safety Parameters 4 <br />Quality Control 4 <br />CONCLUSIONS 5 <br />GENERAL CONDITIONS 7 <br />Figures <br />Figure 1. Well and Sampling Locations <br />Tables <br />Table 1. Results of First Half, 2010, Groundwater Monitoring, GCC Rio Grande, <br />Inc., Pueblo Cement Plant, Pueblo, Colorado. Sampling conducted October <br />26, 2010. <br />Appendix <br />Report # Content <br />Table of Contents <br />PO 984. Kittredge. CO 80457 <br />303 679 9160 f 303 679 -9180 <br />D22645 All groundwater sample analytical data for wells MW002, MW003, <br />MW004, and DUP -01 <br />D22645X Radiochemistry results for wells MW002, MW003, MW004, and DUP -01 <br />ii <br />