Laserfiche WebLink
BULDOZER WORK <br />Description <br />Cross Sectional Area <br />(SF) <br />Linear Feet <br />I (LF) <br />I Loose Volume I <br />I (LCY) I <br />Unit Cost <br />($ /LCY) <br />I Total Cost <br />I ($) <br />Backfill Pit Highwall = Slope 4:1 - Cross Section C -C' <br />I 698 <br />I 2500 <br />1 64,630 <br />I $ 1.00 <br />$ 64,629.63 <br />$ 64,629.63 <br />Table L -4 GCC Rio Grande Pueblo Limestone Mine Reclamation Cost Estimate Bulldozer Work <br />GCC Rio Grande, Inc. -- Technical Revision 1 <br />