Laserfiche WebLink
DESCRIPTION <br />ARROYO RESTORATION <br />Scraper fill work <br />Revegetation -25% Failure Rate <br />'1.1l QUARRY -Final Pit='_. <br />Bulldozer work <br />Revegetation -25% Failure Rate <br />TOTAL ESTIMATE- direct costs <br />ABBREVIATIONS <br />Table L -1 GCC Rio Grande Pueblo Limestone Mine Quantity Takeoff and Draft Cost Summary <br />MATERIAL DIMENSIONS (Ft) QUANTITY UNIT $ /UNIT COST ($) <br />Grading <br />Spread topsoil <br />Fertilize,Seed, Mulch <br />883,710 LCY $ 1.00 $883,710 <br />43,560 LCY $ 1.00 $43,560 <br />27 ACRE $ 512.72 $17,304 <br />ARROYO SUBTOTAL $944,574 <br />Grading 698 sq ft x 2500 ft 64,630 LCY $ 1 00 $64,630 <br />Grading /spread topsoil 9800 ft * 200 ft* 1 ft / 27 72,600 LCY $ 1.00 $72,600 <br />Fertilize,Seed, Mulch 9800 ft * 200 ft 45 ACRE $ 512 72 $28,841 <br />LIMESTONE QUARRY SUBTOTAL $166,070 <br />$1,110,644 <br />LCY Loose Cubic Yard <br />GCC Rio Grande Inc., Technical Revision 1 <br />