Laserfiche WebLink
Warranty for Amendment 3 permit <br />$2,868,162.00 <br />Additional warranty for Amendment 4, now in <br />$365,000.00 <br />Amendment 4 topsoiling release on Phase 1 <br />($138,848.00) <br />Phase 2 slurry wall release <br />($1,007,887.00) <br />$201,577.00 <br />20% retention of slurry wall cost for possible repair <br />Revised warranty <br />$2,288,004.00 <br />Cazier, Tim <br />From: Gary Tuttle [garyjtuttle @gmail.com] <br />Sent: Wednesday, February 15, 2012 10:24 AM <br />To: --j Cazier, Tim <br />Cc: 'Bud Herskind' <br />Subject: Partial Warran Release on Pueblo East <br />February 15, 2012 <br />Tim: <br />Gary J.Tuttle <br />7 tiocsea4gtetv <br />303.653.5584 <br />garyjtuttle(a.gmail.com <br />PO Box 485 <br />Broomfield, CO 80038 -0485 <br />Categories: Construction Materials <br />C' o C J F.Trr2 - 2 - A6z: Fty,k TA-A/, .' - ;20/2_ 1 c rrer <br />My letter to you of January 27, 2012 contained an error in the existing financial warranty amount for the permit. Below is a <br />revised table. <br />As we talked on the phone, I have included a 20% figure for possible repair to the slurry wall per DRMS policy. <br />1 <br />