Laserfiche WebLink
Description <br />No / <br />Acre <br />Cost /Acre <br />Crimping, with tractor {DMG survey data} <br />Fertilizer <br />Pellet Cost <br />$65.89 <br />Power mulcher (MEANS 32 91 13.16 0250) <br />ACRE <br />$79.71 <br />Weed spray, truck, aquatic area, nox. [DMG] <br />Straw, delivered {MEANS 31 25 14.16 1200} <br />$60.19 <br />Totals Nursery Stock Cost / Acre <br />Total Mulch Application Cost /Acre <br />$205.79 <br />Common Name <br />No / <br />Acre <br />Type and Size <br />Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br />Cost /Acre <br />1.00 <br />ACRE <br />$31.80 <br />$31.80 <br />Straw, delivered {MEANS 31 25 14.16 1200} <br />$ <br />Totals Nursery Stock Cost / Acre <br />$0.00 <br />Description <br />Units / <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />Herbicide - Curtail @ 8.0 pt/ac <br />1.00 <br />ACRE <br />$31.80 <br />$31.80 <br />Straw, delivered {MEANS 31 25 14.16 1200} <br />2.00 <br />TON <br />$164.00 <br />$328.00 <br />Total Mulch Materials Cost /Acre <br />$359.80 <br />Reveg Worksheet Cont'd <br />MULCHING and MISCELLANEOUS <br />Materials <br />Application <br />NURSERY STOCK PLANTING <br />JOB TIME AND COST <br />No. of Acres: 9 Cost /Acre: $864.24 <br />Estimated Failure Rate: 40% Cost /Acre *: $864.24 <br />*Selected Replanting Work Items: FERTILIZING,TILLING,SEEDING,MU <br />LCHING <br />Initial Job Cost: <br />Reseeding Job Cost: <br />Total Job Cost: <br />Job Hours: <br />$7,778.16 <br />$3,111.26 <br />$10,889.42 <br />8.00 <br />Task # 03A <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />