Laserfiche WebLink
Machine <br />Description <br />Weight/ <br />Unit <br />(TONS) <br />Owner ship <br />Cost/hr/ unit <br />Haul Rig <br />Cost/hr /unit <br />Fleet <br />Size <br />Haul Trip <br />Cost/hr/ <br />fleet <br />Return Trip <br />Cost/hr/ fleet <br />DOT Permit <br />Cost/ fleet <br />Cat D8T - 8SU <br />47.71 <br />$58.56 <br />$117.55 <br />1 <br />$176.11 <br />$117.55 <br />$250.00 <br />Cat 627G w /push <br />pull <br />43.48 <br />$68.13 <br />$117.55 <br />2 <br />$371.36 <br />$235.10 <br />$500.00 <br />CAT 120M <br />15.53 <br />$22.97 <br />$88.67 <br />1 <br />$111.64 <br />$88.67 <br />$250.00 <br />Drill /Broadcast <br />Seeder with Tractor <br />25.00 <br />$39.59 <br />$88.67 <br />1 <br />$128.26 <br />$88.67 <br />$250.00 <br />Machine Description <br />Total Cost/hr/ unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Light Duty Pickup, 4x4, 3/4 T. <br />$15.11 <br />2 <br />$30.22 <br />$30.22 <br />Available Rig Capacities <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />Task description: <br />Site: 31 Road Pit <br />PROJECT IDENTIFICATION <br />Task #: 10A State: Colorado <br />Date: 2/13/2012 County: Mesa <br />User: THM <br />Agency or organization name' DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Cost Breakdown: <br />NON ROADABLE EQUIPMENT: <br />ROADABLE EQUIPMENT: <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Mobilization <br />Page 1 of 2 <br />Permit Action: SI -01 Permit/Job #: M1987178 <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Subtotals: <br />Subtotals: <br />Shift basis: <br />Cost Data Source: <br />Abbreviation: None <br />$787.37 <br />Filename M178 -10a <br />1 per day <br />CRG Data <br />$529.99 <br />$30.22 <br />$30.22 <br />$1,250.00 <br />CIRCES Cost Estimating Software <br />