My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-13_INSPECTION - M1987178
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1987178
>
2012-02-13_INSPECTION - M1987178
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:48:33 PM
Creation date
2/22/2012 7:32:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987178
IBM Index Class Name
INSPECTION
Doc Date
2/13/2012
Doc Name
Inspection Report
From
DRMS
To
Parkerson Construction, Inc.
Inspection Date
1/31/2012
Email Name
THM
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: 31 Road Pit <br />PROJECT IDENTIFICATION <br />Task #: 06A State: Colorado <br />Date: 2/13/2012 County: Mesa <br />User: THM <br />Cost Breakdown: <br />Unit cost: <br />Agency or organization name DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 120M <br />Ripper Attachment: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Spread overburden on pit floor - 12" depth <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />$80.40 per acre <br />MOTOR GRADER WORK <br />Permit Action: SI -01 Permit/Job #: M1987178 <br />$22.97 <br />$42.91 <br />$0.00 <br />$38.49 <br />$104.38 <br />Total Fleet Cost/Hour: $104.38 <br />Utilization % <br />NA <br />100 <br />NA <br />HOURLY PRODUCTION <br />Average Grader Speed: 1.50 mph <br />Selected Application: Finish grading (0 -2.5 mph) - 1.5 <br />Selected Blade Angle: 30 degrees <br />Effective Blade Length: 10.40 feet <br />Width of blade overlap per pass: 2.00 feet <br />Net grading or ripping width per pass: 8.40 feet <br />Unadjusted Hourly Unit Production: 1.5273 acres /hour <br />Job Condition Correction Factors Site Altitude: 4700 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.85 (lsh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />1.2982 acres/Hour <br />1.2982 acres/Hour <br />Total job cost: $2,814.00 <br />Abbreviation: None <br />Filename: M178-06a <br />Horsepower: 138 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 35.00 acres <br />Source of estimated acreage: Previously accepted values AM -01 <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 26.96 Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.