Laserfiche WebLink
Task description: <br />Site: 31 Road Pit <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />03A <br />2/13/2012 <br />THM <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Ownership Cost /Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Cat D8T - 8SU <br />310 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Total unit Cost/Hour: $206.21 <br />Total Fleet Cost/Hour: $206.21 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />4,330 <br />1.000 <br />4,330 LCY <br />State: <br />County: <br />Source of estimated volume: Previously accepted values AM -01 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 75 feet <br />Unadjusted hourly production: 1,017.1 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />-10 % <br />4,700 feet <br />Material weight: 1,600 lbs /LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />BULLDOZER WORK <br />Push topsoil down regraded highwall slopes <br />$58.56 <br />$109.17 <br />$0.00 <br />$38.49 <br />Permit Action: SI -01 <br />DRMS <br />0.750 <br />1.200 <br />1.000 <br />Colorado <br />Mesa <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />Page 1 of 2 <br />Permit/Job #: M1987178 <br />Abbreviation: None <br />Filename: M178 -03a <br />CIRCES Cost Estimating Software <br />