Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />03A <br />2/9/2012 <br />THM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Cost Breakdown: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost/hour: $798.03 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />10,755 <br />10,755 <br />Source of estimated volume: <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />- Scraper: <br />- Dozer: <br />Scraper Work Team <br />1,600 lbs /LCY <br />Top Soil <br />52,800 pounds <br />33.00 LCY <br />SCRAPER TEAM WORK <br />Task description: Place 4" top soil over 20 acres <br />Site: Orchard Mesa Aggr Permit Action: SI -02 <br />State: Colorado <br />County: Mesa <br />Equipment Description <br />Cat 627G w /push -pull <br />NA <br />Cat D8T - 8SU <br />NA <br />NA <br />NA <br />CCY <br />LCY <br />Source of estimated swell factor: Cat Handbook <br />COSTShift basis: 1 per day <br />Support Equipment <br />Swell factor: 1.000 <br />Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />Abbreviation: None <br />15.70 <br />22.00 <br />18.85 <br />18.85 <br />Page 1 of 2 <br />Permit/Job #: M1995005 <br />Filename: M005 -03a <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />100 <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$68.13 <br />NA <br />$58.56 <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$189.10 <br />NA <br />$109.17 <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$38.67 <br />NA <br />$38.49 <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$295.91 <br />NA <br />$206.21 <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />1 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$591.82 <br />Support: <br />$206.21 <br />Maint: <br />$0.00 <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />03A <br />2/9/2012 <br />THM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Cost Breakdown: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost/hour: $798.03 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />10,755 <br />10,755 <br />Source of estimated volume: <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />- Scraper: <br />- Dozer: <br />Scraper Work Team <br />1,600 lbs /LCY <br />Top Soil <br />52,800 pounds <br />33.00 LCY <br />SCRAPER TEAM WORK <br />Task description: Place 4" top soil over 20 acres <br />Site: Orchard Mesa Aggr Permit Action: SI -02 <br />State: Colorado <br />County: Mesa <br />Equipment Description <br />Cat 627G w /push -pull <br />NA <br />Cat D8T - 8SU <br />NA <br />NA <br />NA <br />CCY <br />LCY <br />Source of estimated swell factor: Cat Handbook <br />COSTShift basis: 1 per day <br />Support Equipment <br />Swell factor: 1.000 <br />Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />Abbreviation: None <br />15.70 <br />22.00 <br />18.85 <br />18.85 <br />Page 1 of 2 <br />Permit/Job #: M1995005 <br />Filename: M005 -03a <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />