My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-10_INSPECTION - M2001060
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2001060
>
2012-02-10_INSPECTION - M2001060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:48:31 PM
Creation date
2/16/2012 8:00:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001060
IBM Index Class Name
INSPECTION
Doc Date
2/10/2012
Doc Name
Insp Rpt
From
DRMS
To
3B Enterprises, LLC
Inspection Date
2/2/2012
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Waypoint <br />GPS location <br />38 <br />40.50996, <br />- 107.52459 <br />39 <br />40.50948, <br />- 107.52458 <br />40 <br />40.50963, <br />- 107.52548 <br />41 <br />40.50963, <br />- 107.52530 <br />42 <br />40.50978, <br />- 107.52538 <br />43 <br />40.50979, <br />- 107.52513 <br />44 <br />40.50992, <br />- 107.52528 <br />45 <br />40.50988, <br />- 107.52565 <br />46 <br />40.51005, <br />- 107.52734 <br />47 <br />40.50995, <br />- 107.52707 <br />48 <br />40.50986, <br />- 107.52635 <br />OBSERVATIONS <br />PERMIT #: M- 2001 -060 <br />INSPECTOR'S INITIALS: DMC <br />INSPECTION DATE: February 2, 2012 <br />This inspection occurred in order to observe the sampling activities taking place at the Deakins <br />Pit on February 2, 2012. Steve Baker, the Operator, and Ben Langenfeld, with Greg Lewicki and <br />Associates, L.L.C., were present. <br />Sampling at the site was determined to be necessary in order to determine whether imported <br />material used for backfill along the north slope of the pit was inert, and to determine if the <br />placement of this material into the backfilled slopes at the site could potentially have a negative <br />effect on the groundwater quality in the area. <br />During this inspection, waypoints were located with a Garmin GPS. Points are tabled following <br />this report. <br />Prior to this inspection, two piezometers had been installed along the east permit boundary at <br />waypoints 38 and 39. Groundwater samples were taken from each of the two piezometers. An <br />additional groundwater sample was taken from the pit water, just below a seep in the pit wall, at <br />waypoint 40. <br />Nine auger holes were drilled by Odell Drilling, Inc., with a track mounted drill rig, into the <br />backfilled material along the north side of the pit. Seven samples of the backfilled material were <br />collected from holes located at waypoints 41, 42, 44, 45, 46, 47, and 48. Two holes drilled at <br />waypoint 43 encountered the native gravel material and samples were not taken. Three of the <br />collected samples (waypoints 41, 44 and 46) were selected for SPLP testing, based on the <br />location of the sample point and visual inspection of the material. <br />The groundwater samples (3) and backfill material samples (3) were taken by Ben Langenfeld <br />for delivery to a laboratory. <br />Responses to this inspection report should be directed to Dustin Czapla at the Division of <br />Reclamation, Mining and Safety, Grand Junction Field Office, 101 South 3rd Street, Room 301, <br />Grand Junction, Colorado 81501, phone number (970) 243 -6299. <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.