My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-07_PERMIT FILE - M2011054
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011054
>
2012-02-07_PERMIT FILE - M2011054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:48:26 PM
Creation date
2/16/2012 7:25:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011054
IBM Index Class Name
PERMIT FILE
Doc Date
2/7/2012
Doc Name
Second Adequacy Review
From
DRMS
To
Oldcastle Sw Group, Inc.
Email Name
THM
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip 0.6 acre internal haul road <br />Debeque Sand and Gravel Permit Action: <br />Site: Resource <br />PROJECT IDENTIFICATION <br />Task #: 03A <br />Date: 2/7/2012 <br />User: THM <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Cost Breakdown: <br />Area: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />JOB TIME AND COST <br />Fleet size: 1 Ripper(s) <br />Unit cost: $416.876 Per acre <br />State: Colorado <br />County: Mesa <br />Agency or organization name' DRMS <br />Ripper Attachment: 1 -Shank Ripper <br />$65.94 <br />$109.17 <br />$9.76 <br />$38.49 <br />$223.36 <br />Total Fleet Cost/Hour: $223.36 <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA BCY NA <br />Area: 0.60 acres Rip Depth (ft): 2.00 Volume: 1,936 BCY or CCY <br />Source of estimated quantity: Staff Estimate <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Average Dozer Speed: <br />Average Maneuver Time: <br />Production per unit area: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />Initial Cost Estimate Permit/Job #: M2011054 <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />NA feet/second <br />3.71 mph <br />5.56 degrees <br />500.00 feet <br />88.00 feet <br />0.25 feet <br />0.646 acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.646 Acres /hr <br />Site Altitude: 4,880 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />0.54 Acres/hr <br />0.54 Acres/hr <br />Total job time: <br />Total job cost: $250.00 <br />Abbreviation: None <br />Filename: M054 -03a <br />1.12 Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.