Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />O la <br />02a <br />03a <br />04a <br />05a <br />Backfill Phase 1 <br />SCRAPER1 <br />C•I ■-■ <br />135.54 <br />$294,152.26 <br />$8,796.39 <br />$250.00 <br />$30,055.13 <br />$9,996.36 <br />Topsoil Phase 1 and internal haul road <br />SCRAPER1 <br />4.05 <br />Rip 0.6 acre intemal haul road <br />RIPPER <br />1.11 <br />Revegetate 13.2 acres of Phase 1 and internal haul <br />road <br />REVEGE <br />24.00 <br />Mobilization <br />MOBILIZE <br />6.00 <br />SUBTOTALS: <br />170.7 <br />$ $343,250.14 <br />COST SUMMARY <br />Task description: Initial Cost Estimate <br />Debeque Sand and Gravel Permit Action: <br />Site: Resource <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date: 2/7/2012 <br />User: THM <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />State: Colorado <br />County: Mesa <br />DRMS <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />Initial Cost Estimate Permit/Job #: M2011054 <br />2.02 Total = <br />1.05 Total = <br />85.35 Total = <br />10.00 Total = <br />TOTAL 0 & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />500.00 <br />0.00 <br />5.00 <br />CONTINGENCY: 3.00 <br />Abbreviation: None <br />Filename: M054 -001 <br />Total = <br />Total = <br />$6,933.65 <br />$3,604.13 <br />$5,061.26 <br />$34,325.01 <br />$49,924.05 <br />$393,174.19 <br />500.00 <br />$0.00 <br />$19,658.71 <br />Total = $10,297.50 <br />TOTAL INDIRECT COST = $80,380.26 <br />TOTAL BOND AMOUNT (direct + indirect) = $423,630.40 <br />