Laserfiche WebLink
N enN00 <br />NMM <br />N mA00 <br />N Po .000 <br />N WO.N <br />x NnAm <br />N ew.aoo <br />ZONE 7 - 100.6 ACRES <br />SUBSOIL: BENCH 1 SURFACE SPOIL <br />24 "+ THICKNESS <br />TOPSOIL: MIXED TOPSOIL <br />12.20" THICKNESS (13" AVG.): <br />.ill:• <br />ZONE 7 <br />100.6 AC <br />NH2 PERMIT BOUNDARY <br />l <br />v; <br />ZONE 7 2011 <br />REPLACEMENT <br />AREA 42.18 AC <br />DID SUBSOIL <br />137,770 CUYD's <br />ZONE 4 2011 <br />A LIFT REPLACEMENT <br />AREA 47.83 AC <br />-ZONE 4 2011 <br />B LIFT REPLACEMENT <br />AREA 43.47 AC <br />ZONE 5 <br />1.90AC <br />37,994 cy N <br />STOCKPILE 13 <br />7.172 cy <br />STOCKPILE <br />ZONE 6 - 106.8 ACRES <br />SUBSOIL: BENCH 1 SURFACE SPOIL <br />30 "+ THICKNESS <br />TOPSOIL: MIXED TOPSOIL <br />15 -24" (21" AVG.) THICKNESS <br />" POND 32 <br />ZONE 3 <br />31.68 AC <br />326,108 cy <br />8,853 cy <br />STOCKPILE <br />OBI SUBSOIL <br />30,956 CUxD <br />ZONE 3 - 31.68 ACRES <br />SUBSOIL: LIFT B TOPSOIL <br />33 "+ THICKNESS <br />TOPSOIL: MIXED TOPSOIL <br />21" AVG. THICKNESS WITH A <br />COMBINED THICKNESS) OF 54" <br />8,050 cy <br />STOCKPRE 15 <br />Morgan Mixed; <br />12.21 AC <br />16 <br />ZONE 1 - 7.81 ACRES <br />SUBSOIL: BENCH 1 SURFACE SPOIL_ <br />33 "+ THICKNESS <br />TOPSOIL: CURRENTLY HAS -17" OF <br />MIXED TOPSOIL. 4" MORE WILL BE <br />ADDED FOR A 21" AVG. THICKNESS <br />WITH A COMBINED THICKNESS OF 54" <br />ZONE 2 -12.21 ACRES <br />SUBSOIL: BENCH 1 SURFACE SPOIL <br />33 "+ THICKNESS <br />TOPSOIL: MIXED TOPSOIL <br />21" AVG. THICKNESS WITH A <br />COMBINED THICKNESS OF 54" <br />.ONE 1 <br />.81 AC <br />-- - - -- Irerloenent <br />-w <br />-/77 7 Tj <br />5,780 cp AREA 4 -MDCED <br />STOCKPI.Ea- TOPSOIL NEEDED <br />._ MD2D 5,780cy <br />ro <br />0 <br />m <br />- Gar <br />11 �I 1111 <br />ion II <br />PERIMETER ROAD' <br />1 <br />007 <br />a <br />REQUIRED TOPSOIL Non - Morgan (in cubic Yard, <br />10,590 Pre 95 Liftl AREAL Stockpile <br />- 200 Pre 95 Liftl AREAL Required Fill <br />10,390 Pre 95 Liftl AREAL Balance <br />41,760 Pre Lift2 AREAL Stockpile <br />- 400 Pre Lift2 AREAL Required Fill <br />41,360 Pre Lift2 AREAL Balance <br />66,025 Pre 95 MIxed AREA2 &3 Stockpile <br />- 43,433 Pre 95 Mixed AREA2 &3 Required Fill <br />22,592 Pre 95 Mix AREA2 &3 Balance <br />5,780 Mixed AREA4 Stockpile Total <br />- 5 780 Mixed AREA4 Required Fill - 0.8ft DEPTH <br />0 Mixed AREA4 Balance <br />69,955 2011 Zone 7 Mixed Stockpile Total <br />= 76,631 2011 Zone 7 Mixed Min. Required Fill - l.Oft DEPTH <br />Zone 7 Mixed Balance <br />13,266 2011 Zone 8 Mixed Stockpile Total <br />- 14,760 2011 Zone 8 Mixed Required Fill - 3.2ft DEPTH <br />Zone 8 -Mixed Balance <br />66,504 2011 TOTAL EOY TOPSOIL BALANCE (Non- Morgan) <br />-------------------------------------- <br />MORGAN TOPSOIL BALANCE an _cull, Yards) <br />132,271 2011 TOPSOIL Stockpile MIXED <br />- 131,238 2011 TOPSOIL Required Fill MIXED <br />1,033 2011 MIXED Balanced <br />348,708 2011 TOPSOIL Stockpile B Lift <br />- 333,419 2011 TOPSOIL Required Fill B Lift <br />15,289 2011 B Lift Balanced <br />225,374 2011 TOPSOIL Stockpile A Lift <br />- 154,343 2011 TOPSOIL Required Fill A Lift <br />71,031 2011 A Lift Balanced <br />87,353 TOTAL EOY MORGAN SOIL BALANCE <br />r <br />i <br />= 35,280 cy <br />x eoa,NOo <br />PAINE PERMIT BOUNDARY <br />2011 TOPSOIL <br />° STOCKPILES <br />(Typical) <br />N, 2011 OBI SUBSO", <br />STOCKPILE <br />(Typical) <br />x w,,aoo <br />N KC1=1 <br />x OYg000 <br />x aaN,aro <br />vcb alama°0'.; <br />p'lv1�n� a d Sat��l <br />, <br />ao 1� <br />Pre 95 MIXED = 5,015 ey <br />AREA 3- PRE 95 SOLD _ <br />TOPSOIL NEEDED <br />MIXED = 29,308 c y '- <br />Pre 95 LIFT 2 = 41,780 cy <br />x ln.000 <br />11 200 0 400 800 <br />I I <br />Pr �� 95 LIFT 1 = 8,260cy scar IN rtEr <br />i . _ STOCrmR.E 1 <br />EXHIBIT 2011 -10 <br />WESTERN FUELS - COLORADO <br />l\ Pyre 95 MIXED = 2,990 ,p aG - A LIMITED LIABILITY COMPANY <br />�r _- fimncicprlF .5 NEW HORIZON MINE <br />P.0 Box 628, NUCLA. CO. 81424 <br />F: \Eng \DATA \ACAD \rec - repo \2011\ <br />EzhiB2011�'IH2_COMP.dw <br />N 6Y= <br />2011 TOPSOIL BALANCE <br />GUBKA, P.E. <br />2011 TOPSOIL STOCKPILES (Fn cull, Yard,l <br />Stockpile <br />ID Amount Stockpile Type <br />1. 6,260 Pre 95 Lifti -AREAL <br />2. 4,330 Pre 95 Uftl -AREA2 Pre 95 Liftl - AREAL +2 Total 10.590 <br />3. 41,760 Pre 95 Lift2 -AREA2 Pre 95 Lift2 -AREA2 Total 4 <br />41.760 <br />4. 5,015 Pre 95 Mixed -AREAS <br />5. 2,990 Pre 95 Mixed - AREA3 <br />6. 22,740 Pre 95 Mixed - AREA3 <br />7. 35,280 Pre 95 Mixed -AREAS Pre 95 Mixed -AREAS Total 6 <br />66.025 <br />B. 5,780 Mixed -AREA4 Mixed -AREA4 Total 5 <br />5780 <br />9. 13,266 Mixed -Zone 8 Mixed -Zone 8 Total 1 <br />13,226 <br />10. 9,410 Mixed -Zone 7 <br />11. 5,848 Mixed -Zone 7 <br />12. 16,703 Mixed -Zone 7 <br />13. 37,994 Mixed -Zone 7 Mixed -Zone 7 Total 6 <br />69.955 <br />14. 124,221 Morgan Mixed <br />15. 8,050 Morgan Mixed Total Morgan Mixed . <br />.132.271 <br />16. 326,108 Morgan BLift <br />17. 22,600 Morgan BLift Total Morgan BLift 4 <br />43 8.708 <br />18. 209,339 Morgan ALift <br />19. 8,863 Morgan ALift <br />20. 7,172 Morgan ALift Total Morgan ALift ! <br />!225.374 <br />NON- MORGAN TOPSOIL REPLACEMENT CALCULATIONS <br />a AREA OR ZONE SQFT & DEPTH CUYD's <br />PRE 95 LIFT 1 -AREAS 10,790 *0.5/27 200 Total 2 <br />200 <br />PRE 95 LH?T 2 -AREAL 10,790 *1.0/27 400 Total 4 <br />400 <br />PRE 95 Mixed AREA2 476,720 *0.8/27 14,125 <br />PRE 95 Mixed AREAS 791,316 *1.0/2729,308 Total 4 <br />43.433 <br />AREA4 MIXED 195,906 *0.8/27 5,780 Total 5 <br />5780 <br />ZONE 7 (MIXED) 1,880,942 *1.1/27 76,631 Total 7 <br />76.631 <br />ZONE 8 (PF MIXED) 123,275 *3.16/27 14,728 Total 1 <br />14.728 <br />MORGAN TOPSOIL REPLACEMENT CALCULATIONS <br />ZONE SQFT & DEPTH CUYD's <br />I(MIXED) 340,247 *0.3/27 3,781 <br />s 2(MIXED) 531,868 *1.8/27 35,458 <br />3(MIXED) 1,379,992 *1.8/27 91,999 Total 131.238 <br />3(B LIFT) 1,379,992 *2.75/27 140,555 <br />4(B LIFT) 1,893,576 *2.75/27 192,864 Total 3313.419 <br />4(A LIFT) 2,083,626 *2.0/27 154,343 Total 154,343 <br />-w <br />-/77 7 Tj <br />5,780 cp AREA 4 -MDCED <br />STOCKPI.Ea- TOPSOIL NEEDED <br />._ MD2D 5,780cy <br />ro <br />0 <br />m <br />- Gar <br />11 �I 1111 <br />ion II <br />PERIMETER ROAD' <br />1 <br />007 <br />a <br />REQUIRED TOPSOIL Non - Morgan (in cubic Yard, <br />10,590 Pre 95 Liftl AREAL Stockpile <br />- 200 Pre 95 Liftl AREAL Required Fill <br />10,390 Pre 95 Liftl AREAL Balance <br />41,760 Pre Lift2 AREAL Stockpile <br />- 400 Pre Lift2 AREAL Required Fill <br />41,360 Pre Lift2 AREAL Balance <br />66,025 Pre 95 MIxed AREA2 &3 Stockpile <br />- 43,433 Pre 95 Mixed AREA2 &3 Required Fill <br />22,592 Pre 95 Mix AREA2 &3 Balance <br />5,780 Mixed AREA4 Stockpile Total <br />- 5 780 Mixed AREA4 Required Fill - 0.8ft DEPTH <br />0 Mixed AREA4 Balance <br />69,955 2011 Zone 7 Mixed Stockpile Total <br />= 76,631 2011 Zone 7 Mixed Min. Required Fill - l.Oft DEPTH <br />Zone 7 Mixed Balance <br />13,266 2011 Zone 8 Mixed Stockpile Total <br />- 14,760 2011 Zone 8 Mixed Required Fill - 3.2ft DEPTH <br />Zone 8 -Mixed Balance <br />66,504 2011 TOTAL EOY TOPSOIL BALANCE (Non- Morgan) <br />-------------------------------------- <br />MORGAN TOPSOIL BALANCE an _cull, Yards) <br />132,271 2011 TOPSOIL Stockpile MIXED <br />- 131,238 2011 TOPSOIL Required Fill MIXED <br />1,033 2011 MIXED Balanced <br />348,708 2011 TOPSOIL Stockpile B Lift <br />- 333,419 2011 TOPSOIL Required Fill B Lift <br />15,289 2011 B Lift Balanced <br />225,374 2011 TOPSOIL Stockpile A Lift <br />- 154,343 2011 TOPSOIL Required Fill A Lift <br />71,031 2011 A Lift Balanced <br />87,353 TOTAL EOY MORGAN SOIL BALANCE <br />r <br />i <br />= 35,280 cy <br />x eoa,NOo <br />PAINE PERMIT BOUNDARY <br />2011 TOPSOIL <br />° STOCKPILES <br />(Typical) <br />N, 2011 OBI SUBSO", <br />STOCKPILE <br />(Typical) <br />x w,,aoo <br />N KC1=1 <br />x OYg000 <br />x aaN,aro <br />vcb alama°0'.; <br />p'lv1�n� a d Sat��l <br />, <br />ao 1� <br />Pre 95 MIXED = 5,015 ey <br />AREA 3- PRE 95 SOLD _ <br />TOPSOIL NEEDED <br />MIXED = 29,308 c y '- <br />Pre 95 LIFT 2 = 41,780 cy <br />x ln.000 <br />11 200 0 400 800 <br />I I <br />Pr �� 95 LIFT 1 = 8,260cy scar IN rtEr <br />i . _ STOCrmR.E 1 <br />EXHIBIT 2011 -10 <br />WESTERN FUELS - COLORADO <br />l\ Pyre 95 MIXED = 2,990 ,p aG - A LIMITED LIABILITY COMPANY <br />�r _- fimncicprlF .5 NEW HORIZON MINE <br />P.0 Box 628, NUCLA. CO. 81424 <br />F: \Eng \DATA \ACAD \rec - repo \2011\ <br />EzhiB2011�'IH2_COMP.dw <br />N 6Y= <br />2011 TOPSOIL BALANCE <br />GUBKA, P.E. <br />