Laserfiche WebLink
Land Status Category <br />Last Years <br />Cumulative Total <br />This Calendar <br />Year <br />Cumulative Total <br />Acres disturbed <br />241.7 <br />+ <br />0.0 <br />= <br />241.7 <br />Acres backfilled and graded <br />187.6 <br />+ <br />36.1 <br />= <br />223.7 <br />Acres topsoiled <br />126.0 <br />+ <br />0.0 <br />= <br />126.0 <br />Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year_ 2011____ <br />Roadside Portals <br />mine name <br />Address: P.O. Box 1430, Palisade, CO 81526 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 241.7 and the total number of acres: <br />Phase I released 216.9 <br />C - 81 - 041 <br />permit # <br />Phase II released 89.5 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed N/A <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 2 18 <br />Acreage in active mining areas 3 - 0 - <br />'(exclude acres where Phase III release has been achieved) <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />Snowcap Coal Company, Inc. <br />Permittee <br />Phase III released 89.5 <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head -of- hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by- products disposal areas). <br />Last Years <br />Cumulative <br />Total <br />This <br />Calendar <br />year <br />Cumulative <br />Total' <br />10 years or <br />less <br />Greater <br />than 10 <br />years' <br />51.3 <br />Acres seeded* <br />148.1 <br />+ <br />2.7 <br />= <br />150.8 <br />= <br />99.5 <br />+ <br />Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year_ 2011____ <br />Roadside Portals <br />mine name <br />Address: P.O. Box 1430, Palisade, CO 81526 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 241.7 and the total number of acres: <br />Phase I released 216.9 <br />C - 81 - 041 <br />permit # <br />Phase II released 89.5 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed N/A <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 2 18 <br />Acreage in active mining areas 3 - 0 - <br />'(exclude acres where Phase III release has been achieved) <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />Snowcap Coal Company, Inc. <br />Permittee <br />Phase III released 89.5 <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head -of- hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by- products disposal areas). <br />