Laserfiche WebLink
13 -41) <br />Haul Road A/Pond 006 Landslide Remediation Plan <br />134E <br />Sedimentation Structure Pond 006 — Phase V Design Report <br />13 -5 <br />Design Report Temporary Sedimentation Structure Pond 009 <br />13 -5A <br />As -Built Report Temporary Sedimentation Structure Pond 009 <br />13 -5B <br />Drainage and Sediment Control Plan II -W South Extension <br />13 -5C <br />Sedimentation Pond 015 Stability Analysis <br />13 -51) <br />As -Built Report Sedimentation Structure Pond 015 <br />13 -5E <br />Sedimentation Pond 016 Stability Analysis <br />13 -5F <br />As -Built Report Pond 016A and Pond 016 Two Pond System <br />13 -5G <br />Sedimentation Pond 017 Stability Analysis <br />13 -5H <br />As -Built Report Sedimentation Structure Pond 017 (Reserved) <br />13 -6 <br />Roadside Ditch Calculations <br />13 -6a <br />General Design for Haul Road Ditch Porous Rock Check Dams <br />13 -7 <br />Culvert Calculations <br />13 -8 <br />Designs for Catchment Sumps of Small Area Exemptions (SAE) <br />13 -9 <br />Generic Culvert Calculations — Light Use Roads <br />13 -10 <br />Haul Roads Construction Summaries <br />13 -11 <br />Stock Tank Typical Design <br />13 -11A <br />Stock Tank T -25, T -26 and T -27 Design <br />13 -12 <br />Pit Slope Stability Analysis <br />LIST OF EXHIBITS <br />T7__1_:1_7. 'XT_ <br />13 -1 <br />Facilities Map <br />13 -2 <br />Surface Hydrology <br />13 -2A <br />Eliminated <br />13 -3 <br />Surface Water Control Plan - Tie - Across Haul Road <br />13 -4 <br />Watershed Boundary Partial <br />13 -5 <br />Proposed Sedimentation Pond 005 <br />13 -5A <br />Pond 005 As -Built <br />13 -6 <br />Pond 006 Phase II As -Built <br />13 -6A <br />Pond 006 Phase IV Subwatershed Map <br />PR -06 iii Revised O1/11 <br />