Laserfiche WebLink
,,A <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Sunday, Oct130/2011 Arrive Time: 10:30 AM <br />Depart Time: <br />Project Name: RPE <br />Clear <br />Number: M11001 MT <br />Mountain Coal Company <br />Contractor: <br />Contractor: High Country <br />Equipment <br />Representative: <br />Supervisor: <br />Superintendent or Foreman: Andy Pavlisick <br />of Fill Material: Wash Plant Plans and Specs: <br />Prepared by: Dated: <br />.tor's Equipment Used: Dozer, excavator, haul truck, loader, vibratory sheepsfoot compactor <br />Lambert and Associates Equipment Used - Manufacturer: CPN Serial Number or Unit Number: 18 <br />Test Results were Verbally Given On -Site to: <br />Expected Conditions Observed: Yes <br />Unexpected Conditions Observed: No <br />Conditions Observed: No <br />yes, who was contacted? <br />Alow -up from Prior Visit: <br />Retests Performed: <br />for Next Visit: <br />personnel contacted on -site: name/firm <br />Retests Needed: <br />Notes: <br />1 performed nuclear field density tests as requested by Andy Pavltsick of material being placed for fill at the Refuse Pile <br />Expansion. Andy showed the technician the area that was prepared and ready for testing. Lambert and Associates' <br />technician chose the test locations within the area that was ready for testing Please refer to the these results sheets <br />for approximate test locations and test results. The test results indicate only the relative compaction and soil moisture <br />content of the material tested at the elevation and location tested at the time of our site visit. Moisture content samples <br />were obtained. <br />Lambert and Associates Technician: Hayes <br />