My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-13_HYDROLOGY - C1980007
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1980007
>
2012-02-13_HYDROLOGY - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:48:33 PM
Creation date
2/13/2012 3:04:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Hydrology
Doc Date
2/13/2012
Doc Name
4th Quarter 2011 Quarterly Pond Inspection Report (Emailed)
From
Mountain Coal Company
To
DRMS
Permit Index Doc Type
Sediment Pond Inspections
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wert wth <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Saturday /Ocb112011 Arrive Time: 10:30 AM <br />Depart Time: <br />Project Name: RPE Weather Clear <br />Project Number: M11001MT Temp: <br />Client: Mountain Coal Company Client Representative: <br />General Contractor: Supervisor: <br />Specialty Contractor: High Country Specialty Superintendent or Foreman: Andy Pavlisick <br />Equipment <br />Source of Fill Material: Wash Plant Plans and Specs: N/A <br />Prepared by: Dated: <br />Contractor's Equipment Used: Dozers, excavator, blade, loader, vibratory sheepsfoot compactor <br />Lambert and Associates Equipment Used - Manufacturer: CPN Serial Number or Unit Number: 18 <br />Test Results were Verbally Given On -Sete to: <br />Expected Conditions Observed: Yes <br />Unexpected Conditions Observed: No <br />Conditions Observed: No <br />If y who was co <br />Follow -up from Prior Visit: <br />Retests Performed: None <br />for Next Visit: None <br />personnel contacted on -site: name/firm <br />Retests Needed: None <br />1 performed nuclear freld density tests, as requested by Andy Pavlisick of material being placed for fill at the Refuse Pile <br />Expansion East. Andy showed the technician the area that was prepared and ready for testing. Lambert and <br />Associates'technician chose the test locations within the area that was ready for testing. Please refer to the test <br />results sheets for approximate test locations and test results. The test results indicate only the relative compaction and <br />soil moisture content of the material tested at the elevation and location tested at the time of our site visit. Moisture <br />content samples were obtained. <br />Lambert and Associat Technician: Hayes <br />
The URL can be used to link to this page
Your browser does not support the video tag.