Laserfiche WebLink
1 I : M 4 1 - a V , . f , fm =.- I <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />D AILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Thursday, Oct/27/7011 <br />Arrive Time: 10:45 AM <br />Depart Time: <br />Project Name: RPE <br />Weather: Clear <br />Project Number: M11001 MT <br />Temp: <br />Client: Mountain Coal Company <br />Client Representative: <br />General Contractor: <br />Supervisor: <br />Specialty Contractor: High Country <br />Equipment <br />Specialty Superintendent or Foreman: Andy Pavlisick <br />Source of Fill Material: Wash Plant <br />Plans and Specs: <br />Prepared by: Date <br />Equipment Used: Dozers, loader, excavator, haul truck, vibratory sheepsfoot compactor <br />Lambert and Associates Equipment Used - Manufacturer: CPN Serial Number or Unit Number: 18 <br />Test Results were Verbally Given On-Site to: <br />Expected Conditions Observed: Yes <br />Unexpected Conditions Observed. No <br />Unusual Conditions Observed: No <br />If yes, who was contacted? <br />Follow -up from Prior Visit: <br />for Next Visit: <br />Retests Performed: <br />Retests Needed: <br />personnel contacted on -site: name/firm <br />Notes: <br />l performed nuclear field density tests as requested by Andy Pavlisick of material being placed for fill at the Refuse Pile <br />Expansion, Andy showed the technician the area that was prepared and ready for testing. L ambert and Associates' <br />technician chose the test locations within the area that was ready for testing. Please refer to the these results sheets <br />for approximate test locations and test results. The test results indicate only the relative compaction and soil moisture <br />content of the material tested at the elevation and location tested at the time of our site visit. Moisture content samples <br />were obtained. <br />Lambert and Associates Technician: Hayes <br />