Laserfiche WebLink
xamh <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Tuesday /OW42011 I Depart rrive Time: 10:30 AM <br />Time: <br />Project Name: <br />Project Number: M11001MT <br />Client: Mountain Coal Company <br />ral Contractor: <br />Temp: <br />Overcast <br />Client Representative: <br />pecialty Contractor: High Country Specialty Superintendent or Foreman: Andy Pavlisick <br />Equipment <br />ource of Fill Material: Wash Plant Plans and Specs: N/A <br />Prepared by: Dated: <br />Dntractor's Equipment Used: Dozers, loader, haul truck, excavator, blade, vibratory sheeosfoot compactor <br />)ert and Associates Equipment Used - Manufacturer: <br />Results were Verbally Given On -Site to: <br />cted Conditions Observed: Yes <br />Conditions Observed: No <br />Unusual Conditions Observed: No <br />If yes, who was contacted? <br />Follow -up from Prior Visit: <br />Concerns for Next Visit: None <br />personnel contacted on -site: namelfirm <br />CPN Serial Number or Unit Number: <br />Retests Performed: <br />Retests Needed: <br />18 <br />Notes: <br />1 performed nuclear field density tests, as requested by Andy Pavlisick of material being placed for fill at the Refuse Pile <br />Expansion. Andy showed the technician the area that was prepared and ready for testing. Lambert and Associates <br />technician chose the test locations within the area that was ready for testing. Please refer to the test results sheets for <br />approximate test locations and test results. The test results indicate only the relative compaction and soil moisture <br />content of the material tested at the elevation and location tested at the time of our site visit. Moisture content samples <br />were obtained. <br />Lambert and Associates Technician: Hayes <br />