Laserfiche WebLink
ry <br />'"wpm mb c f�l rhttez <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Monday /0c&W011 Arrive Time: 10:30 AM <br />Depart Time: <br />Project Name: RPE Weather Clear <br />Number: M11001 MT Temp: <br />Mountain Coal Company Client Representative: <br />I Contractor: Supervisor: <br />ty Contractor: High Country <br />Equipment Specialty Superintendent or Foreman: Andy Pavlisick <br />Or Fill Matenal: Wash Plant Plans and Specs: N/A <br />Prepared by: Dated: <br />toes Equipment Used: Dozers, loader, haul truck, excavator, vibratory sheepsfoot compactor <br />Lambert and Associates Equipment Used - Manufacturer: <br />Test Results were Verbally Given On -Site to: <br />Expected Conditions Observed: Yes <br />CPN Serial Number or Unit Number: <br />18 <br />Conditions Observed: No <br />Unusual Conditions Observed: No <br />If yes, who was contacted? <br />Follow -up from Prior Visit: <br />Retests Performed: <br />for Next Visit: <br />personnel contacted on -site: name /firm <br />Retests Needed: <br />Notes: <br />1 performed nuclear field density tests, as requested by Andy Pavlisick of material being placed for fill at the Refuse Pile <br />Expansion. Andy showed the technician the area that was prepared and ready for testing. Lambert and Associates <br />technician chose the test locations within the area that was ready for testing. Please refer to the test results sheets for <br />approximate test locations and test results. The test results indicate only the relative compaction and soil moisture <br />content of the material tested at the elevation and location tested at the time of our site visit. Moisture content samples <br />were obtained. <br />Lamb ert and Associates Technician: Hayes <br />