Laserfiche WebLink
;! r J, 4 ZtJ 7 A, 4, , , , tttrb &AMIaes <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Sunday /0ct%2/1011 Arrive Time: 10:00 AM <br />Depart Time: <br />Project Name: RPE Weather Clear <br />Number: M11001MT <br />lient: Mountain Coal Company <br />Contractor: <br />Temp: <br />Representative: <br />Supervisor: <br />airy Contractor: Nigh Country Specialty Superintendent or Foreman: Andy Pavlisick <br />Equipment <br />Or Fill Matenal: Wash Plant Plans and Specs: N/A <br />Prepared by: Dated: <br />:tors Equipment Used: Dozers, blade, haul truck, excavator, vibratory sheepsfoot compactor <br />Lambert and Associa Equip Use - Man <br />Test R esults we Ve rbally Give On -Sit to: <br />Expected Conditions Observed: Yes <br />CPN Serial Number or Unit Number: <br />18 <br />Unexpected Conditions Observed: No <br />ual Conditions Observed: No <br />yes, who w as contacted? <br />Alow -up from Prior Visit: <br />Concerns for Next Visit: None <br />personnel contacted on -site: namelfirm <br />Retests Performed: <br />Retests Needed: <br />Notes: <br />1 performed nuclear field density tests, as requested by Andy Pavlisick of material being placed for rill at the Refuse Pile <br />Expansion East. Andy showed the technician the area that was prepared and ready for testing. Lambert and <br />Associates' technician chose the test locations within the area that was ready for testing. Please refer to the test <br />results sheets for approximate test locations and test results. The test results indicate only the relative compaction and <br />soil moisture content of the material tested at the elevation and location tested at the time of our site visit. Moisture <br />content samples were obtained. <br />and Associates Technician: Hayes <br />