Laserfiche WebLink
STRUCTURE/FACILITY/EQUIPMENT DESCRIPTION <br />DIMENSIONS <br />COMPOSITION <br />QUANT. <br />UNIT <br />UNIT COST <br />TOTAL COST <br />\ NNI1114921111113:131621i1KM\ <br />XV: <br />.\\ ' * •X' <br />■ N. <br />.% . <br />\ <br />Use Bowie No. 2 Mine reclamation estimate unit <br />costs to estimate Bowie No. 2 Mine bond amount <br />Reference Bowie No. 2 Mine - Task No. 43 <br />0.724 <br />Gob Pile Expansion Area = 1.8 Acres <br />Increase in Gob Pile footprint = 0.90 acres <br />4' Cover over 0.9 acres = 5,808 cy <br />Cover gob pile with 4 non-toxic material <br />Fill <br />5808 <br />CY <br />$ 0.724 <br />$ 4,204.99 <br />Reference Bowie No. 2 Mine - Task No. 202 <br />$ 3,189.820 <br />Revegetation Gob Pile & West Cut Area <br />1.8 <br />AC <br />$ 3,189.82 <br />$ 5,741.68 <br />Broadcast seed Mix 3 <br />Subtotal <br />9,948.67 <br />Burden <br />25% <br />$ 2,486.67 <br />Task No.: 1 <br />Permit No.: C-96-038 <br />Date: 2-6-2012 <br />Permitting Action: Technical Revision Application No. 72 <br />RECLAMATION ESTIMATE <br />Task Description: Place 4' Cover on gob pile , seed Gob pile and associated disturbance <br />Prepared by: TKB <br />Filename: <br />Operation: Bowie No. 2 Mine <br />TASK TOTAL <br />$ 12,433.34 <br />