Laserfiche WebLink
1 <br />• A new pump motor was installed in the 7H-1V, and a new submersible pump was <br />installed in the 11 H -R. <br />• A workover rig conducted operations on the 10H -I in an attempt to reestablish injection. <br />• The following wells were cleaned out and had bladder pumps and /or pressure <br />transducers reinstalled; <br />o DS -3 and DS-4: pumps and transducers removed to run gamma ray <br />subsidence logs. The pumps and transducers were reinstalled. <br />o BG -5 had a new transducer and new sample lines installed. <br />o BG -1, BG-4, and DS -2 transducers were recalibrated. <br />o The DS -3 sample pump failed in April 2011, and had to be bailed. A fishing rig <br />was brought in to clean out the well and removed some material. The sample <br />pump remains inoperable and as of 12/31/2011, sampling has been conducted <br />by bailing. <br />o The 89 -3 experienced sample pump failure or plugged sample lines in <br />September 2011. Sampling was done by bailing. <br />Daub & Associates, Inc. 9 NSI Annual Report 2010 <br />